My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2300 - Underground Storage Tank Program
>
PR0231848
>
COMPLIANCE INFO_2006 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 1:33:46 PM
Creation date
1/10/2020 1:36:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2018
RECORD_ID
PR0231848
PE
2361
FACILITY_ID
FA0002052
FACILITY_NAME
NuStar Terminals Operations Partnership L.P.
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16203004
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: x Tank Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure x Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Dwyer Manometer Equipment Resolution: +/-2% <br /> Is Tank Exempt From Testing?' ❑Yes x No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> Tank Capacity: 10,000 <br /> Tank Material: Fiberglass <br /> Tank Manufacturer: Unknown <br /> Product Stored: Waste Water <br /> Wait time between applying <br /> pressure/vacuum/water and 30 min 30 min 30 min 30 min <br /> starting test: <br /> Test Start Time: 10:00 <br /> Initial Reading(Rl): 8.35 <br /> Test End Time: 11:00 <br /> Final Reading(RF): 8.33 <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-Rl): .02 <br /> Pass/Fail Threshold or Criteria: No less than 1" No less than 1" No less than 1" No less than 1" <br /> Test Result: x Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA <br /> Was sensor properly replaced and x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes []No ❑NA x Yes ❑No ❑NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment <br /> to tina I('alifnrnia f^AA Titly 7'I Cr>rtinn')ATVWA( l <br />
The URL can be used to link to this page
Your browser does not support the video tag.