Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑ Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 0-15 PSI <br /> Piping Run# 1 Piping Run#2 Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith <br /> Piping Diameter: 4" 4" <br /> Length of Piping Run: 30' 60' <br /> Product Stored: Water Water <br /> Method and location of Test boot Test boot Test boot Test boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: 9:10 9:10 <br /> Initial Reading(R,): 5 PSI 5 PSI <br /> Test End Time: 9:40 9:40 <br /> Final Reading(RF): 3.1 PSI 5 PSI <br /> "Test Duration: 30 min 30 min 30 min 30 min <br /> Change in Reading(RF-R,): 1.9 0 <br /> Pass/Fail Threshold or 0 drop 0 drop 0 drop 0 drop <br /> Criteria: <br /> Test Result: ❑ Pass x Fail a Pass ❑Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Line did not show signs of any leaks in the sump. <br />