My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2300 - Underground Storage Tank Program
>
PR0231848
>
COMPLIANCE INFO_2006 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 1:33:46 PM
Creation date
1/10/2020 1:36:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2018
RECORD_ID
PR0231848
PE
2361
FACILITY_ID
FA0002052
FACILITY_NAME
NuStar Terminals Operations Partnership L.P.
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16203004
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.SECONDARY PIPE TESTING _ <br /> Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Test reducer boots,Nitrogen and gauges Equipment Resolution:0.5%of span <br /> Piping Run#1 Piping Run#2 <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Ameron Ameron <br /> Piping Diameter: 3" 3" <br /> Length of Piping Run: 100, 100' <br /> Product Stored: Contact Water Contact Water <br /> Method and location of Reducer Boots/Fittings Reducer Boots/Fittings <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes 10 minutes <br /> starting test: <br /> Test Start Time: 12:30 pm 12:30 pm <br /> Initial Reading(Rj): 5 psi 5 psi <br /> Test End Time: 1:30 pm 1:30 pm <br /> Final Reading(RF): 5 psi 5 psi <br /> Test Duration: 1 hr. 1 hr. <br /> Change in Reading(Rr-Rj): None None <br /> Pass/Fail Threshold or No detectable Loss No detectable Loss <br /> Criteria: <br /> Test Result: 21 Pass ❑Fail 0 Pass ❑Fail <br /> COMMentS—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> I <br /> I <br /> 1=A11/IRt°lA1NAcwtTA+ <br /> r <br /> WI=AI TW nuE)ioTAACAIT <br />
The URL can be used to link to this page
Your browser does not support the video tag.