My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2300 - Underground Storage Tank Program
>
PR0231848
>
COMPLIANCE INFO_2006 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 1:33:46 PM
Creation date
1/10/2020 1:36:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2018
RECORD_ID
PR0231848
PE
2361
FACILITY_ID
FA0002052
FACILITY_NAME
NuStar Terminals Operations Partnership L.P.
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16203004
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer R Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Incon Sump Tester Equipment Resolution: +/-0.002" <br /> STP Sump#1 <br /> Sump Diameter: 42" <br /> Sump Depth: 48" <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 12" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 19" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Good <br /> Portion of Sump Tested' 2"above piping <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes❑No ®NA <br /> product and water)?` <br /> Turbine shutdown response time N/A <br /> Is system programmed for fail-safe ❑ Yes❑No ®NA <br /> shutdown?` <br /> Was fail-safe verified to be ❑Yes❑No ®NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 30 minutes <br /> test: <br /> Test Start Time: 1:10 pm <br /> Initial Reading(RT): 4.4275 ' <br /> Test End Time: 1:25 pm <br /> Final Reading(RF): 4.4262 <br /> Test Duration: 15 min. <br /> Change in Reading(RrR,): 0.0013 <br /> Pass/Fail Threshold or Criteria: +/-0.002" NCpiTU nCoeo AACIV r <br /> Test Result: D Pass D Fail <br /> Was sensor removed for testing? ®Yes❑No❑NA <br /> Was sensor properly replaced and ®Yes❑No❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> "Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment testing scope of work". <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-I60) <br />
The URL can be used to link to this page
Your browser does not support the video tag.