Laserfiche WebLink
JUN 12 2015 <br /> Monitoring System Certification-Page 2 of 3 <br /> ENVIRONMENTAL <br /> : ,rAIT 1 nr7AnTe+5 13115 <br /> Site Address: 3505 Navy Dr. Date of Testing/Servicing: <br /> D. Results of Testing/Servicing <br /> Software Version Installed. 4.003 <br /> Complete the foliowin checklist: <br /> 0 Yes ❑ No* Is the audible alarm operational? <br /> ® Yes ❑ No* Is the visual alarm operational? <br /> 19 Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ® Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alanns are relayed to a remote monitoring station,is all communications equipment(e.g.modem) <br /> ® N/A operational? <br /> ❑ Yes ❑ No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> M N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate <br /> positive shut-down? (Check all that apply) ❑ Sump/Trench Sensors; ❑ Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ❑ Yes ❑ No <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no <br /> ® N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fillpoint(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? 0 <br /> ❑ Yes* 00 No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑ Product;❑ Water. If yes,describe causes in Section E,below. <br /> ® Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings? Attach set-up reports, if applicable.) <br /> licable. <br /> ® Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: Tank is monitored by 2nd Piping Sump Sensor(ALS) -Tested & Passed. <br />