My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2300 - Underground Storage Tank Program
>
PR0231848
>
COMPLIANCE INFO_2006 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 1:33:46 PM
Creation date
1/10/2020 1:36:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2018
RECORD_ID
PR0231848
PE
2361
FACILITY_ID
FA0002052
FACILITY_NAME
NuStar Terminals Operations Partnership L.P.
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16203004
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification-Page 3 of 3 JUN 12 2015 <br /> `ENVIRONMENTAL <br /> Site Address: 3505 Navy Dr. 17at"e offiesnnglSer43icing: 5/13/15 <br /> F. In -Tank Gauging/SIR Equipment: 0 Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank ganging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the folio ing checklist: <br /> 0 Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> 0 Yes 0 No* Was accuracy of system product level readings tested? <br /> 0 Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled property? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In Section H below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): 0 Check this box if LLD's are not installed. <br /> Com lete the folio in2 checklist: <br /> 0 Yes 0 No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: 0 3 g.p.h.(I.); 0 0.1 g.p.h.(2.); 0 0.2 g.p.h.(2.). <br /> Notes: 1. Required for equipment start-up certification rLd annual certification. <br /> 2. Unless mandated by local agency,certification required only for electronic LLD start-up. <br /> 0 Yes D No* Were all LLD's confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes 0 No* Was the testing apparatus properly calibrated? <br /> 0 Yes 0 No* For mechanical LLD's,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> 0 Yes 0 No* For electronic LLD's,does the turbine automatically shut off if the I.LD detects a leak? <br /> 0 N/A <br /> ❑ Yes 0 No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 0 N/A or disconnected? <br /> ❑ Yes 0 No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system <br /> 0 N/A malfunctions or fails a test? <br /> ❑ Yes ❑ No* For electronic LLD's,have all accessible wiring connections been visually inspected? <br /> 0 N/A <br /> ❑ Yes ❑ No* tWere all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below,describe how and when these deficiencies were or will be corrected. <br /> It. Comments: Tank is monitored by a Sensor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.