Laserfiche WebLink
Monitoring System Certification-Page 3 of 3 JUN 12 2015 <br /> `ENVIRONMENTAL <br /> Site Address: 3505 Navy Dr. 17at"e offiesnnglSer43icing: 5/13/15 <br /> F. In -Tank Gauging/SIR Equipment: 0 Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank ganging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the folio ing checklist: <br /> 0 Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> 0 Yes 0 No* Was accuracy of system product level readings tested? <br /> 0 Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled property? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In Section H below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): 0 Check this box if LLD's are not installed. <br /> Com lete the folio in2 checklist: <br /> 0 Yes 0 No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: 0 3 g.p.h.(I.); 0 0.1 g.p.h.(2.); 0 0.2 g.p.h.(2.). <br /> Notes: 1. Required for equipment start-up certification rLd annual certification. <br /> 2. Unless mandated by local agency,certification required only for electronic LLD start-up. <br /> 0 Yes D No* Were all LLD's confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes 0 No* Was the testing apparatus properly calibrated? <br /> 0 Yes 0 No* For mechanical LLD's,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> 0 Yes 0 No* For electronic LLD's,does the turbine automatically shut off if the I.LD detects a leak? <br /> 0 N/A <br /> ❑ Yes 0 No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 0 N/A or disconnected? <br /> ❑ Yes 0 No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system <br /> 0 N/A malfunctions or fails a test? <br /> ❑ Yes ❑ No* For electronic LLD's,have all accessible wiring connections been visually inspected? <br /> 0 N/A <br /> ❑ Yes ❑ No* tWere all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below,describe how and when these deficiencies were or will be corrected. <br /> It. Comments: Tank is monitored by a Sensor. <br />