Laserfiche WebLink
a <br /> i <br /> WORK AUTHORIZATION <br /> CHANGE ORDER I <br /> Date: 08/05/97 Change Order No.: 1 <br /> Client:. Diesel Performance Contract No.: NIA <br /> Principal: Ms. Lori Shields Proposal/Proj No.:.P90897/97735 ! <br /> REVISED CONTRACT AMOUNT: <br /> Previous Contract Amount: $3,537.60 <br /> Amount of this Order: $ 444.40 <br /> New Contract Amount: $3,982.00 <br /> Scope of Work: Advance two additional borings to depths ofd5, feet and:45 feet bgs; collect four <br /> additional sod,';samples for analysis of TPHg BTEX, and MTBE; and additional <br /> repaint preparation time including boring logs and data tabulation and evaluation. <br /> Schedule of Work: July 23, 1997 through September 15, 1997 <br /> The Work covered by this'change order shall be performed under th'e same Terms and Conditions as that <br /> Contract. <br /> included in the Original Con <br /> i <br /> Accepted and agreed to by: ' <br /> Smith Technology Corporation N <br /> Name: Name: <br /> 3 <br /> Signature: Signature: <br /> Title: Title: <br /> Date: Date: <br /> P.O. Number(if applicable): <br /> w:lpmposaflchnga.doc <br /> It <br /> 13 <br />