Laserfiche WebLink
„r <br /> 09 May 1997 <br /> AGE-NC Proposal No 97-1344 <br /> Page 4 of 5 <br /> • Access to the site will be secured by the Client, all activities at the site can be performed <br /> during normal working hours <br /> • All costs incurred due to regulatory directives, after this proposal, shall be assumed by the <br /> Client <br /> • Expense incurred because of unusual or unanticipated ground conditions (such as fill, hard <br /> soil, rock, etc) shall be paid for by tine Client as extra work <br /> • Regulatory approval of the Work Plait <br /> 7.0. LIMITATIONS <br /> Should there be any regulatory objections to the project or unanticipated regulatory requirements, <br /> only the fees for services performed to that tinie will be billed based on our Standard Schedule of <br /> Charges Should the regulatory agencies require additional monitoring or other services beyond the <br /> scope presented herein, or should drilling/sampling show that contamination is more extensive than <br /> Previous reports present,the scope of work will need to be expanded at an additional cost submitted <br /> in written form prior to any actual work performed <br /> We look forward to working with you to obtain closure for your site The opportunity to prepare this <br /> proposal is greatly appreciated Please contact our office if you have any questions <br /> Sincerely, <br /> Advanced GeoEn�c�ironmental, Inc. <br /> Bob Marty <br /> Project Geologist/Direct f Operations <br /> • <br />