Laserfiche WebLink
• 09 May I997 <br /> AGE-NC Proposal No 97-1344 <br /> Page 3 of 5 <br /> 3.0. COST <br /> The cost for Task 2 1 should not exceed $4,550,00 If ground water sampling is required, the costs <br /> for Tasks 2 1 and 2 2 should not exceed $5,100.00 All costs quoted are based on the scope of work <br /> as discussed above and on our Standard Schedule of Charges, all costs will be billed to the Client <br /> on a time and materials basis This proposal shall be consummated upon authorization and receipt <br /> of$1,000 00 deposit <br /> If additional soil and/or ground water samples are submitted for analysis, the cost will not exceed <br /> $115 00/each(TPH-g, TPH-d, TPH-k, BTE&X and M IBE) <br /> 4.0. PAYMENT SCHEDULE <br /> AGE shall submit monthly invoices to DIESEL PERFORMANCE, INC for payment Invoices will <br /> specify the actual costs incurred during the billing period The invoices will detail when the services <br /> were performed and may include a breakdown for direct labor, indirect costs, travel, equipment, <br /> . materials and supplies, and subcontractor services Work shall begin within five days of <br /> authorization and receipt of$1,000 00 deposit <br /> 5.0. ITEMS NOT INCLUDED IN THIS PROPOSAL <br /> The following items are not included in this proposal <br /> Disposal of contaminated soil and/or ground water <br /> • Additional sampling and/or analysis, if required by the regulatory agencies <br /> • Installation of ground water monitoring wells, if required <br /> Geophysical survey, if needed, to locate underground utilities <br /> • Regulatory oversight fees <br /> • All other costs not specifically stated in this proposal <br /> 6.0 ASSUMPTIONS <br /> This proposal assumes the following <br />