• <br /> 1 <br /> The potential generation of dust during site activities will be minimized by the application of <br /> ' water to the soil, if necessary. No liquid run-off will be allowed during wetting of the soils. Any <br /> residual soil or dust waste generated during loading of trucks will be immediately mitigated and <br /> ' returned to the soil stockpile for reloading. <br /> ' After the limits of the excavation have been reached, Del-Tech will fill the excavated area <br /> using imported pea gravel and fill sand, as appropriate to achieve the level of compaction necessary <br /> ' to restore the site. During the backfill process, Del-Tech will also make any necessary repairs to <br /> sanitary and/or storm sewer laterals disturbed during the removal of the clarifier. Del-Tech will <br /> obtain any permits necessary for such repairs of sub-grade piping and restoring the concrete floor of <br /> the building. <br /> ' Following the completion of excavation, disposal, and backfilling activities, Lee & Pierce <br /> ' will prepare a technical report detailing the methods and results of the remedial actions. <br /> ' The Health and Safety Plan included in this document has been developed specifically for <br /> activities related to the remediation of soils at the subject site. The plan is based on the <br /> ' requirements of 29 CFR 1910.120, "Hazardous Waste Operations and Emergency Responses". <br /> This Health and Safety Plan will remain in force and all contractors will be required to comply <br /> ' with its provisions during any site activities involving potential exposure to hazardous <br /> substances. Personnel involved in site activities potentially involving exposure to hazardous <br /> ' waste will be required to have completed the 40 hour training specified in 29 CFR 1910. <br /> 5.0 REQUIREMENTS <br /> ' All work will be conducted under the supervision of John Lane of Lee & Pierce. Mr. <br /> Lane is a registered Professional Geologist (California PG#6795). The work will be conducted <br /> in accordance with this soil removal plan and site safety plan, consistent with standard operating <br /> procedures outlined in Appendix A, and pursuant to accepted practices established by the EHD. <br /> 1 <br /> SOIL REMOVAL WORKPLAN [04113111] 5 LEE&PIERCE INC.[JOB#107591 <br />