My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2911
>
2900 - Site Mitigation Program
>
PR0535086
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 1:20:29 PM
Creation date
1/13/2020 1:13:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0535086
PE
2953
FACILITY_ID
FA0020278
FACILITY_NAME
UNITED RENTALS
STREET_NUMBER
2911
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14308057
CURRENT_STATUS
01
SITE_LOCATION
2911 E FREMONT ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.0 SITE AND SAFETY PLAN <br /> As indicated throughout the plan, selected sections should only be filled out by those with <br /> technical expertise in health and safety issues. In addition, state organizations using this plan <br /> should set up a system to ensure that: (1) the plan is used properly; and (2) staff follows proper <br /> safety procedures. The Site supervisor will ensure that all employees who will be working at the <br /> job site have the appropriate certification in hazardous waste site operations. <br /> PART I <br /> ' Part I (Sections I-IV) should be completed prior to the site visit and turned in with permit <br /> application. <br /> ' SECTION I. GENERAL INFORMATION <br /> SITE NAME AND ADDRESS: United Rentals <br /> 2911 E. Fremont Street <br /> Stockton, CA <br /> CONTACT PERSON AND PHONE NUMBER: LEE & PIERCE INC. <br /> ATTN: John Lane -209-848-8270 <br /> SITE IDENTIFICATION NUMBER: N/A <br /> PROPOSED DATE(S) OF SITE WORK: Between May 1 and May 15 2011 <br /> ' SECTION 11. DESCRIPTION OF ACTIVITY <br /> PURPOSE OF ACTIVITY: <br /> ❑ New Tank Installation <br /> ❑ Tank Closure <br /> ' ❑ Tank/Pipe Removal/Disposal <br /> ® Site Investigation/Mitigation <br /> ❑ Tank/Pipe Repair <br /> ❑ Leak Detection Testing <br /> ❑ Installation of Monitor Wells/Sampling <br /> ❑ Sampling of Monitor wells <br /> SOIL REMOVAL WORKPLAN [04/13/111 7 LEE&PIERCE INC.[JOB#107591 <br />
The URL can be used to link to this page
Your browser does not support the video tag.