Laserfiche WebLink
S <br /> .� CONTENTS <br /> INTRODUCTION 1 <br /> 1 . 1 Site Setting 1 <br /> 1 .2 Site History 2 <br /> 2. CURRENT STATUS OF THE SITE 3 <br /> 3. DISCUSSION 4 <br /> M 4. WORK PLAN 6 <br /> 4. 1 Soil Boring 6 <br /> 4.2 Soil Sampling 7 <br /> 4 .3 Monitoring Well Construction 8 <br /> 4 .4 Well Development 8 <br /> 4. 5 Well Survey 9 <br /> 4 .6 Groundwater Sampling 9 <br /> 4.6. 1 Sampling Equipment Preparation 9 <br /> 4.6.2 Presampling Measurements 10 <br /> 4.6. 3 Well Purging t0 <br /> 4.6.4 Well Sampling 11 <br /> `-' 4.6. 5 Blanks 12 <br /> 4.6.6 Sample Analysis 12 <br /> 5. SCHEDULE 13 <br /> 6. REFERENCES 14 <br /> F . <br /> a. <br /> ion <br /> 1 <br /> t <br />