My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
5709
>
2900 - Site Mitigation Program
>
PR0523858
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 4:31:03 PM
Creation date
1/14/2020 3:33:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0523858
PE
2960
FACILITY_ID
FA0016067
FACILITY_NAME
FORMER BUFFALO TANK
STREET_NUMBER
5709
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
10123019
CURRENT_STATUS
01
SITE_LOCATION
5709 E FREMONT ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CaliforniVegional Water Quality C rol Board Fsz <br /> Central Valley Region <br /> Katherine Hart, Chair <br /> 11020 Sim Center Drive,#1200,Rancho Cordova,California 95670-6114 <br /> Matthe�� Rodriquez (916)464 1 •FAX(916)464-4645 Edmund G.Brown Jr. <br /> http://www. nlvalley Governor <br /> Screta'iewa,v for <br /> F.nriroivnneival Proleclior� REGE �" <br /> 12 September 2011 <br /> James Ritchie and Greg McIver E tRONMEN"At HEALTH <br /> PERMIT/SERVICES <br /> The Source Group, Inc. <br /> 751 Laurel Street, Suite 722 <br /> San Carlos, CA 94070 <br /> DOCUMENT REVIEW FOR EAR ACCOUNT CASE # R10-131, BUFFALO TANK, <br /> 5709 EAST FREMONT STREET(AKA STATE HIGHWAY 26 EAST), STOCKTON, <br /> SAN JOAQUIN COUNTY(RB #390791) <br /> 1 reviewed Well Destruction Work Plan (Workplan), received 9 September 2011 from The <br /> Source Group, Inc. (TSGI). The Workplan proposes the abandonment of three monitoring <br /> wells (MW-1 through MW-3) remaining at the site. The groundwater analytical results for <br /> MW-1 through MW-3 were non-detect for petroleum hydrocarbons when last sampled in <br /> December 2006. The Workplan states the wells will be abandoned by pressure grouting at <br /> approximately 150 lbs per square inch each well to 2' below grade, then removal of the traffic <br /> boxes, and finally filling the resulting void with concrete to the surface. Soil cuttings and water <br /> generated during well abandonment will be characterized and properly disposed, or reused <br /> onsite as approved by Regional Board staff. A Well Destruction Report will follow within three <br /> weeks of completion of fieldwork, and will include a summary of fieldwork, analytical data, and <br /> permit / correspondence related to the Workplan. <br /> The Workplan is consistent with the Work Scope and Budget Proposal, DGS EAR Account <br /> Program, Buffalo Tank Corp, Stockton California, EAR Site No. R10-131 approved by me on <br /> 20 June 2011 , and is approved as necessary and appropriate to remove potential conduits to <br /> the aquifer, and to facilitate case closure. Please provide the San Joaquin County <br /> Environmental Health Department and myself with a minimum of 3 working days notice prior to <br /> start of fieldwork, and contact me by phone at (916) 464-4614 or by email at <br /> jbarton(a�waterboards.ca.gov if you have questions or comments. <br /> ames L.L. Barton, P.G. <br /> Engineering Geologist <br /> UST Enforcement Unit II <br /> cc: Marisa Rodarte, State Water Resources Control Board, UST Cleanup Fund <br /> Conrad Lewis, DGS, Real Estate Division, 707 3rd St., West Sacramento 95605 <br /> Lori Duncan, San Joaquin County Environmental Health Department, Stockton <br /> California Environmental Protection Agency <br /> Za 2ecvcled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.