My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
401
>
2900 - Site Mitigation Program
>
PR0524769
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 5:09:43 PM
Creation date
1/14/2020 4:24:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0524769
PE
2960
FACILITY_ID
FA0016627
FACILITY_NAME
PG&E FRENCH CAMP YARD
STREET_NUMBER
401
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19314013
CURRENT_STATUS
02
SITE_LOCATION
401 E FRENCH CAMP RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l , Page 1 of 2 <br /> Mike Infurna [EH] <br /> From: Mike Infurna [EH] <br /> Sent: Monday,August 10, 2009 11:25 AM <br /> To: 'Doran, Neil' <br /> Subject: RE: additional work at PG&E French Camp <br /> much better than doing this tomorrow or Weds... <br /> PDFs are ok with me for submittals.... <br /> your lead agency ok with this all? <br /> From: Doran, Neil [mailto:Neil.Doran@stantec.com] <br /> Sent: Monday, August 10, 2009 11:19 AM <br /> To: Mike Infurna [EH] . <br /> Subject: RE: additional work at PG&E French Camp <br /> Thanks for the quick reply, Mike. <br /> Here's the timeline: I found out late Friday August 7 that we were going to want soil gas data. At <br /> the earliest, we're going to be in the field Friday, August 14, completing the previously-discussed <br /> scope of work. If we can get all our ducks in a row by then,we'd like to install the soil gas probes <br /> during that mobilization. Therefore, I will get you an addendum summary by noon on <br /> Wednesday,August 12, if we want to pursue the soil gas sampling during this mobilization. That <br /> submittal will have a figure, and narrative description of installation and destruction processes. <br /> Thanks again for your help on this. <br /> Neil <br /> Stantec <br /> stantec.com <br /> The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted,or <br /> used for any purpose except with Stantec's written authorization.If you are not the intended recipient,please delete all <br /> copies and notify us immediately. <br /> Please consider the environment before printing this email. <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Monday, August 10, 2009 11:14 AM <br /> To: Doran, Neil <br /> Subject: RE: additional work at PG&E French Camp <br /> same driller, right? then ok... <br /> if not, NO...need a new permit for the soil vapor. <br /> get me a new map. <br /> get me the specs of the soil vapor probes....Le: materials, depths...and also a <br /> Rig�i�nn9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.