Laserfiche WebLink
Page 2 of 2 <br /> narrative page/addendum the calls out the details and especially the <br /> DESTRUCTION PROCESS for these points. <br /> just so I know who's rushing who here WHEN did you KNOW you were gonna <br /> J 9 � Y Y <br /> put in SVprobes? and why tell me 24 hours before?????? <br /> From: Doran, Neil [ma ilto:Neil.Doran @stantec.com] <br /> Sent: Monday, August 10, 2009 10:55 AM <br /> To: Mike Infurna [EH] <br /> Subject: additional work at PG&E French Camp <br /> Mike, <br /> i <br /> We're still hoping to get into the field this week at the PG&E French Camp site; per your request, I'll <br /> give you at least 24 hours notice. <br /> BUT, I have a question: we'd like to do some soil gas sampling, installing two dual-completion <br /> temporary sampling points at depths of 5 and 12 feet below grade. Work will be performed by Gregg <br /> Drilling; can this fall under our existing permit, or do we need to start over? <br /> Let me know what your preference is, and thanks again for being so accommodating on this job thus <br /> far. <br /> Regards, <br /> Neil <br /> Neil Doran,P.G. <br /> Senior Geologist <br /> Ph: (916)384-0722 <br /> Fx: (916)861-0430 <br /> Cell: (510)919-0059 <br /> neil.doran@stantec.com <br /> stantec.com <br /> The content of this email is the confidential property of Stantec and should not be copied, modified, <br /> retransmitted, or used for any purpose except with Stantec's written authorization. If you are not the intended <br /> recipient, please delete all copies and notify us immediately. <br /> Please consider the environment before printing this email. <br /> 8/13/2009 <br />