My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
401
>
2900 - Site Mitigation Program
>
PR0524769
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 5:09:43 PM
Creation date
1/14/2020 4:24:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0524769
PE
2960
FACILITY_ID
FA0016627
FACILITY_NAME
PG&E FRENCH CAMP YARD
STREET_NUMBER
401
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19314013
CURRENT_STATUS
02
SITE_LOCATION
401 E FRENCH CAMP RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
you've been down this road before, uh? <br /> looks ok fine...soil borings for a year then... <br /> let me know your drill/hand auger schedule. Remember, I issued the permit <br /> to YOU...any other driller/P6/PE needs a new permit. <br /> From: Gary Haeck [mailto:ghaeck@secor.com] <br /> Sent: Tuesday,June 06, 2006 3:33 PM <br /> To: Mike Infurna [EH] <br /> Subject: RE: PG&E French Camp open boring permit <br /> Mike, Thanks for the details. I think this situation would qualify. The following information is <br /> relevant to your decision. <br /> The work plan was explicitly written for multiple mobilizations and an uncertain number of borings, <br /> so we wouldn't have the additional expense of submitting another work plan or addendum should <br /> we need to go out again. <br /> Per your Item# 1: I-end of phase, as described in the approved work plan, (i.e: <br /> you said four borings and DID four borings) <br /> Regarding this i.e. I am pasting the following from page two of the work plan. <br /> SCOPE OF WORK <br /> The proposed scope of work includes contingencies for potential remobilizations to the <br /> Site should additional sampling be required to determine the extent of potential impacts. <br /> SECOR proposes... <br /> Task 2B Based on field observations, additional borings may be advanced and <br /> samples collected to determine the extent of potential impacts. <br /> Alternatively, based on analytical results, SECOR will remobilize to the <br /> Site to advance additional borings and collect samples to determine the <br /> extent of potential impacts. SJCEHD will be notified should additional <br /> borings and samples be collected. <br /> FIELD INVESTIGATION <br /> Following clearance of subsurface utilities, the five borings will be hand augered to <br /> depths of five feet bgs with a clean hand auger, which will be decontaminated between <br /> boring locations. As discussed above, based on field observations or analytical results <br /> from the first five borings, additional borings may be advanced and samples collected to <br /> determine the extent of potential impacts. SJCEHD will be notified should additional <br /> borings be required. <br /> I knew going into this that we would likely need to go out there again. I tried to cover all <br /> the bases to protect us both, what do you think? Thanks for the info on DHS <br /> Best Regards Gary <br />
The URL can be used to link to this page
Your browser does not support the video tag.