w <br /> Stantec <br /> April 24,2009 <br /> Ms. Kristi Shelton <br /> REPORTING <br /> A post-remediation closure report will be prepared to document completion of the remedial action and <br /> associated activities. The report will include a description of field activities completed and justification for any <br /> deviation from the work plan, a map showing the excavated areas, a description of the volume of soil <br /> excavated, analytical laboratory results, field screening and confirmation sample results, photographs taken <br /> during site activities, and copies of the waste manifests. <br /> PROPOSED SCHEDULE <br /> Stantec is prepared to begin field activities immediately following approval of the Work Plan-by Board staff. <br /> Stantec anticipates completing well abandonment and field investigation activities within four weeks of Work <br /> Plan approval, and completing remediation and site restoration-activities within approximately 10 weeks of <br /> Work Plan approval. <br /> If you have questions regarding this Work Plan or require additional information, please contact me at 916- <br /> 384-0722, or Ms. Anne Conner of PG&E at(925)415-6381. <br /> Sincerely, <br /> STANTEC CONSULTING CORPORATION <br /> Neil Doran, P.G. <br /> Senior Geologist/Project Manager <br /> Tel: (916) 384-0722 <br /> Fax: (916) 861-0430 <br /> neil.doran@stantec.com <br /> Attachments: Figure 1 -Site Location Map <br /> Figure 2—Site Plan <br /> Figure 3-Proposed Areas of Investigation and Excavation <br /> Figure 4—Truck Route <br /> r <br />