My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
3919
>
2900 - Site Mitigation Program
>
PR0527086
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 11:02:32 AM
Creation date
1/15/2020 10:24:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0527086
PE
2965
FACILITY_ID
FA0018364
FACILITY_NAME
FRENCH CAMP RV PARK
STREET_NUMBER
3919
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20103014
CURRENT_STATUS
01
SITE_LOCATION
3919 E FRENCH CAMP RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
on the well detail. The well log sketch will include the protective casing detail, details on the <br /> size and type of screen used, and centralizer design (if used). Any variations in the proposed <br /> well design will be noted. <br /> 3.0 MONITORING WELL DESIGN <br /> Proposed monitoring well construction materials (e.g., well casing, screen, filter pack, seal, <br /> grout, and well protection) are described in this section. As referenced, the borehole geology <br /> will be used to refine the placement of well screens and gravel pack envelopes. <br /> 3.1 Well Casing and Screen <br /> Well casing and screen sections will be 10 feet in length and will be flush couple threaded <br /> polyvinyl chloride (PVC) (ASTM F480), Schedule 40, two-inch nominal inside diameter. No <br /> PVC solvent will be used. It is anticipated that the well screen will have a 0.020-inch slot size; <br /> however, the screen slot size will be confirmed after analysis of drilling soil samples. The well <br /> bottom will be closed, and the bottom cap will either be threaded or attached with stainless steel <br /> screws. The well screen and casing will be kept clean and free of foreign matter, and washed <br /> with approved water prior to use. Well centralizers, if deemed necessary to maintain the <br /> appropriate plumb, will be PVC or stainless steel, and will be attached to the casing using <br /> stainless steel. The top of the well casing will have a removable Schedule 40 oversized cap to <br /> prevent well contamination. <br /> The contractor will install the screen and casing using the materials described previously. The <br /> contractor will record the well construction details on "as-built" plans, a copy of which will be <br /> given to French Camp. A well installation record will be included with the well log as indicated <br /> above. <br /> Care will be taken to install the protective casing and well casing plumb. Centralizers, if used, <br /> will be installed to center the casing in the bore. Centralizers would be located to minimize <br /> interference with placing the sealing material as specified. Centralizers would not be attached to <br /> the well screen or that part of the well casing exposed to the gravel pack. All joints will be <br /> constructed to provide a straight,non-constricting, and watertight fit. Any casing or screen <br /> deformation or bending will be minimal to the point of allowing the insertion and retrieval of the <br /> pump and/or bailer optimally designed for that size casing. <br /> The contractor will provide means of protecting the well bore and casing assemblies, when <br /> installed, from the entrance of foreign objects. The entry of nuisance water, such as rainfall <br /> runoff or construction water from other construction activities, into the borehole will be <br /> prevented. The contractor will protect the work from damage and take all measures necessary to <br /> prevent delays. <br /> 3.2 Filter Pack, Bentonite Seal, and Grout <br /> Well backfill materials (e.g., filter pack, bentonite, and grout) will form a continuous annular <br /> filling around the well casing. The filter pack will be sand composed of sound durable particles <br /> French Camp-Monitoring Well Installation Workplan 3 SAB027100 <br /> September 2006 CADocuments and Settings\mlagorio\Local Settingffempomry Internet Files\OLK9F\Work Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.