My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1405
>
2900 - Site Mitigation Program
>
PR0505137
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 2:30:47 PM
Creation date
1/15/2020 1:23:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505137
PE
2960
FACILITY_ID
FA0006565
FACILITY_NAME
STOCKTON SOIL TREATMENT FAC
STREET_NUMBER
1405
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1405 S FRESNO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 . Hazards <br /> Storage of Hazardous Substances <br /> Setting and Analysis: <br /> The storage of on-site hazardous substances will be limited <br /> to No . 2 Diesel fuel to be used by the small (Bobcat-type) <br /> front-end loaders in the contaminated soil stockpile area <br /> and treated soil storage area. The fuel will be stored in a <br /> 200-gallon above-ground tank in a diked area near the wash <br /> pad area. The diked area will be of sufficient size to <br /> contain the fuel should spillage or tank leaks occur. <br /> Mitigation Measure: <br /> a. An above-ground fuel tank building permit should be <br /> obtained from the City of Stockton Building Division along <br /> with approval from the City of Stockton Eire Department. <br /> Need for Emergency Plans <br /> Setting and Analysis: <br /> As part of the operational aspects of the project, the <br /> Applicant has prepared a Health and Safety Plan which ad- <br /> dresses hazard assessment , training requirements, medical <br /> requirements, personal protective control measures, monitor- <br /> ing procedures, decontamination procedures, disposal proce- <br /> dures, site work practices and site security. <br /> As required by the San Joaquin County Office of Emergency <br /> Services (OES) , an Emergency Business Plan was prepared and <br /> filed with OES on July, 16 , 1990 . This plan specifies <br /> notification and emergency procedures, evacuation proce- <br /> dures, leak and spill control procedures, and an inventory <br /> of on-site chemicals. <br /> Mitigation Measure: <br /> a. An Updated Emergency Business Plan should be filed with <br /> the San Joaquin County Office of Emergency Services. <br /> 8 . Utilities and Public Services <br /> Sewer Service <br /> Setting and Analysis: <br /> The project will discharge wash water from the contaminated <br /> soil unloading ramp and rain water from the contaminated <br /> soil stockpile area into the City of Stockton municipal <br /> sewer system. As proposed by the Applicant , this wastewater <br /> will be pre-treated for oil/water separation prior to dis- <br /> charge . Under a Wastewater Discharge Permit issued by the <br /> City of Stockton Municipal Utilities Department on June 12 , <br /> 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.