Laserfiche WebLink
o _ <br /> CLEARWATER <br /> C R n U P <br /> EnvirDliviental Services <br /> REPORT LIMITATION <br /> All work performed under this contract was directed by a licensed professional . The work was <br /> l performed in accordance with generally accepted practices at the time the work was performed <br /> and completed in accordance with generally acceptable standards. It should be noted that during <br /> the course of normal business practices, Clearwater may purchase or use equipment, services, or <br /> products in which Clearwater has a professional or financial interest. <br /> This report was prepared under the supervision of a State of California Professional Geologist, <br /> Engineer, or other licensed professional. Statements, conclusions, and recommendations made in <br /> this report are based on information provided to Clearwater, observations of existing site <br /> conditions, our general knowledge of the site, limited testing of selected soil and groundwater <br /> samples, and interpretations of a limited set of data. Clearwater cannot be held responsible for <br /> the accuracy of the analytical work performed by others. <br /> Information and interpretation presented herein are for the use of the client. Third parties should <br /> rely upon the information and interpretation contained in this document at their own risk. No <br /> other warranties, certifications, or representations, either expressed or implied, are made about <br /> the information supplied in this report. The service performed by Clearwater has been conducted <br /> in a manner consistent with the level of care and skill ordinarily exercised by members of our <br /> profession currently practicing under similar conditions in the area of the site. <br /> Sincerely, <br /> CLEARWATER GROUP 9t00AL GFO <br /> Prepared by: Reviewed by: 2� JAMES ALN00 <br /> a JACOBS <br /> NO , 88 <br /> CERTIFIED <br /> HYDROGEOLOGIST <br /> y�� oQ2 <br /> _ F CpV�F <br /> on Wilder, CPSS # 322410 Janes . Jacobs, P .G. o . 815, C.H.G. No . 88 <br /> Project Manager Ch ydrogeologist <br /> Gavin P . Fisco <br /> Staff Geologist <br /> ZB 178N — Barnes Trucking Facility 8. November 2009 <br /> Third Quarter 2009 Quarterly Monitoring Report <br />