Laserfiche WebLink
Page 2 of 2 <br /> M <br /> Clearwater proposes to revise the monitoring scope; to change the sampling to only the on-site <br /> monitoring wells MW- 1 and/or AS- 1 , and one (MW-9) of the newly installed transition zone <br /> monitoring wells. <br /> Please be advised that I will be overseeing the work on this project as Randy Kirby is no longer <br /> with Clearwater. <br /> Please provide your thoughts about revising the scope of the upcoming monitoring event. I can be <br /> contacted at (510) 307-9943 ext. 223 or 510-590- 1099 with any questions you may have. <br /> Thank you. <br /> Olivia <br /> 7/26/2011 <br />