Laserfiche WebLink
' Page I of 2 <br /> N <br /> x <br /> Lori Duncan [EH] <br /> From: Arron Wilder [AWilder@clearwatergroup .com] <br /> Sent: Friday, May 21 , 2010 2:23 PM <br /> i To: Lori Duncan [EH] <br /> Cc: Olivia Jacobs; Jim Jacobsl ; Jim Jacobsl ; John McCain ; Nuel Henderson [EH] <br /> Subject: FW: ZB178A - Barnes Trucking , Soil Investigation May 2010 Summary <br /> Dear Lori - <br /> Following is a brief summary of the two-day soil and groundwater investigation that took place at the 1817 S. <br /> Fresno Ave. , Stockton Site (Barnes Trucking). All soil borings were advanced to 32 feet bgs, continuously <br /> logged , and samples were collected above, within and below the impacted zones, as observed in the field. A <br /> grab groundwater sample was collected from each boring. Samples are being delivered to Kiff Analytical today, <br /> May 20th , 2010 for 7-day turn-around time: <br /> On Tuesday, May 18th, 2010, Clearwater Staff members arrived on-Site at 0930 and set up the Geoprobe rig at <br /> the first soil boring , SB-16, which was located approximately 74 feet south of the tank cage and 3 feet from the <br /> eastern-most fence. This boring was advanced to 32 feet bgs. PID and visual observations from this boring <br /> indicated that no obvious impacts were present. <br /> At 1200, SBA 7 was set up and advanced to 32 feet bgs . SBA 7 was located approximately 43 feet west of the <br /> eastern property fence, approximately 20 feet south of SB-15. Observed lithologic information suggests that no <br /> major impacts were present within soil encountered at this boring . This boring may define the southern boundary <br /> of the sorbed-phase impacts, pending lab results. <br /> i <br /> At 1445, SB-18 was set up and advanced to 32 feet bgs. SB-18 was located equidistant between the eastern <br /> and western corners of the building on-Site, in the middle of the southern-facing wall , approximately 2 feet from <br /> the wall . Impacts were observed , with the zones of greatest impacts present between 22 feet bgs and 26 feet <br /> bgs with a high PID reading of 1 , 177 PPM . These impacts were defined vertically, using the PID and visual/odor <br /> indications, pending lab results. <br /> -0900 on Wednesday,ad y,May 1 in, 2010, SB-1 w� up approximately oximately(rfee et ast oflheGuirdmg ann 5 feet <br /> north of the building's southeast corner. The PID was calibrated using 100 PPM isobutylene gas, and SB-19 was <br /> advanced to 32 feet bgs. Impacts were noted with a PID reading of 3,308 PPM between 22 and 24 feet bgs, with <br /> vertical definition mostly acheived at 32 feet (based on low PID detections), pending lab results. <br /> At 1045, SB-20 was placed 20 feet north of SB-19, in line with SB-19, and advanced to define the area north of <br /> SBA 9. This boring was advanced to 32 feet bgs. Impacts were noted at this boring between 24 and 28 feet bgs, <br /> with a high PID reading of 1 ,717 PPM at 24 feet bgs. At 32 feet, impacts were observed to be decreased, borne <br /> out with a relatively low PID reading. Vertical definition on this boring is expected to be achieved , pending lab <br /> results . <br /> At 1315, the final boring, SB-21 , was set up and advanced to 32 feet bgs. SB-21 was located approximately 25 <br /> feet north of the building , approximately 2 feet west of the western-facing wall of the building on-Site, in a location <br /> presumed to be up/cross gradient from SB- 18. No impacts were noted within soil cores at SB-21 . <br /> Please feel free to let me know if you have any questions regarding this summary information . <br /> Best Regards, <br /> i <br /> Arron Wilder, CPSS #322410 Project Manager/Project Geoscientist <br /> Clearwater Group <br /> 229 Tewksbury Ave. <br /> Point Richmond, CA 94801 <br /> 5/21 /2010 510-307-9943 ext. 236- office <br /> 510-590- 1096 - cell <br />