Quarterly Status Update k orm 5/13/�09 <br /> 1817 Fresno Ave, Stockton California O,IL <br /> Barnes Trucking Company MAY 2 8 2009 <br /> 0 <br /> 0 JAMES A <br /> ENWRONME AZ <br /> Consultant Clearwater Group, PERMIT/S RVIC;:S 4, JACOBS <br /> Jim Jacobs, P.G. 4815� Noe as <br /> C.H.G. # 88� cERTMED <br /> YDR 001ST <br /> Project Manager: AA �10 <br /> Arron Wilder OF ClIkv <br /> V <br /> Environmental Heaft <br /> Department <br /> Case Manager: Lori Duncan Over ight Agency: <br /> Site Code H: 12506 District: San Joaquin <br /> Quarterly Project Status Report <br /> Reporting Period (Quarter/year): Second Quarter 2009 <br /> Project work conducted in reported quarter: <br /> 1 . In a letter dated April 1 , 2009, Clearwater requested a six-month cessation of groundwater monitoring <br /> and iSOC remediation system operations for determination of existence of residual source area. <br /> 2. Per verbal approval by L. Duncan of the SJEHD, the iSOC system was turned off on April 1 , 2009. <br /> 3 . A six-month site monitoring and remediation suspension was granted on April 6, 2009. Per <br /> correspondence from L. Duncan dated April 6, 2009, no second quarter 2009 (2Q09) Groundwater <br /> Monitoring Report will be submitted. <br /> 4m The First Quarter 2009 ( 1 Q09) Groundwater Monitoring Report was uploaded to Geotracker on April <br /> 130� 2009. <br /> Project work anticipated for next reported quarter: <br /> 1 . The third quarter 2009 (3QO9) site event will include groundwater monitoring and sampling of wells <br /> MW-513. MW-7, MW4, and AS-1 . <br /> 2. A groundwater sampling report (3QO9), including status of remediation system cessation will be <br /> submitted after results-fromthe 3dqdar� ifiohitoring-d� &Cf&eived,- - - <br /> 3 . The iSOC system will be returned to its regular operation, <br /> Status of project deliverables: <br /> 1 . The I " Quarter Groundwater Monitoring (I Q09) Report was submitted on April 30, 260� <br /> Status and updates of project schedule: <br /> 1 . September 2009 — a. Conduct third quarter groundwater monitoring event. <br /> b. Start iSOC system after groundwaterMODitoring event is completed. <br /> 2. October 2009 — Submit 3dQuarter Groundwater Monitoring Report (3QO9) with evaluation of <br /> presence of residual impacts and whether or not additional soil remediation is necessary. <br /> Difficulties/DelayN/Other and Actions Taken: <br /> I None. <br /> Project Contacts (Regulators, District Facility personnel, etc.) <br /> Mr. Floyd Barnes, Site Property Owner — 9477 Fountain Valley, Stockton, CA 95209, 209-518-3976; <br /> fly@inreach.com <br /> L <br /> (2"' Quarter, 2009) Quarterly Status Report Version 0510 1/09 <br />