My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1817
>
2900 - Site Mitigation Program
>
PR0540859
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 3:25:25 PM
Creation date
1/15/2020 2:31:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0540859
PE
2960
FACILITY_ID
FA0023361
FACILITY_NAME
PLAY N PARK (FORMER BARNES TRUCKING)
STREET_NUMBER
1817
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1817 S FRESNO AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> Quarterly Status Update Form MAY 0 7 2009 Date: 5/9/09 <br /> 1817 Fresno Ave, Stockton California <br /> Barnes Trucking Company ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br /> Consultant Clearwater Group, Project Manager: Arron Wilder <br /> Jim Jacobs, P.G. It 4815, <br /> C.H.G. # 88, <br /> Environmental Health <br /> Case Manager: Lori Duncan Oversight Agency: Department <br /> Site Code #: 2506 District: San Joaquin <br /> Quarterly Project Status Report <br /> Reporting Period (Quarter/year): Second Quarter 2009 <br /> Project work conducted in reported quarter: <br /> 1 . In a letter dated April 1 , 2009, Clearwater requested a six month cessation of groundwater monitoring <br /> and iSOC remediation system operations for determination of existence of residual source area. <br /> 2. Per verbal approval by L. Duncan of the SJEHD, the iSOC system was turned off on April 1 , 2009. <br /> 3 . A six-month site monitoring and remediation suspension was granted on April 6, 2009. <br /> 4. The First Quarter 2009 (2Q09) Groundwater Monitoring report was uploaded to Geotracker on April <br /> 30, 2009 <br /> Project work anticipated for next reported quarter: <br /> 1 . Groundwater monitoring. and sampling of wells MW-5B, MW-7, MW-8, and AS- 1 . <br /> 2. Groundwater sampling report (3Q09) and status of remediation system cessation submitted after 3rd <br /> quarter monitoring event. <br /> 3. -Return iSOC system--to regular operation. --- <br /> Status of project deliverables: <br /> 1 . 1 " Quarter Groundwater Monitoring Report was submitted on April 30, 2009 <br /> Status and updates of project schedule: <br /> 1 . September 2009 — a. Conduct third quarter groundwater monitoring event <br /> b. Start iSOC system after groundwater monitoring event is completed. <br /> 2 . October 2009 — Submit 3rd Quarter Groundwater Monitoring Report (3Q09) with evaluation of <br /> presence of residual impacts and whether or not additional soil remediation is necessary. <br /> Difficulties/Delays/Other and Actions Taken : <br /> None. <br /> Project Contacts (Regulators, District Facility personnel, etc.) <br /> Mr. Floyd Barnes, Site Property Owner — 9477 Fountain Valley, Stockton, CA 95209, 209-518-3976; <br /> fly@inreach.com <br /> (2n" Quarter, 2009) Quarterly Status Report version 05/01/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.