My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002463
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1817
>
2900 - Site Mitigation Program
>
PR0540859
>
ARCHIVED REPORTS_XR0002463
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 4:15:21 PM
Creation date
1/15/2020 2:54:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002463
RECORD_ID
PR0540859
PE
2960
FACILITY_ID
FA0023361
FACILITY_NAME
PLAY N PARK (FORMER BARNES TRUCKING)
STREET_NUMBER
1817
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1817 S FRESNO AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLEA"R:R-`ATER <br /> GROL [' [ v C <br /> En trunmeirt if Ser gees <br /> TABLE OF CONTENTS <br /> 1 0 INTRODUCTION 1 <br /> 2 0 BACKGROUND 1 <br /> 2 1 Site Description 1 <br /> 2 2 Site History 1 <br /> 2 3 Purpose of Additional Assessment 3 <br /> 3 0 SOIL BORINGS, WELL INSTALLATION AND WELL DESTRUCTION <br /> ACTIVITIES 3 <br /> 4 0 GROUNDWATER MONITORING ACTIVITIES 4 <br /> 5 0 SOIL BORINGS AND MONITORING RESULTS 5 <br /> 5 1 SedimentologicalObservations 5 <br /> 5 2 Soil Sampling Analytical Results 5 <br /> 5 3 Groundwater Flow Direction and Gradient 5 <br /> 5 4 Groundwater Analytical Results 6 <br /> 6 0 SUMMARY AND CONCLUSIONS 6 <br /> 7 0 RECOMMENDATIONS 8 <br /> 8 0 CERTIFICATION 9 <br /> TABLES <br /> Table 1 Cumulative Soil Sample Analytical Results <br /> Table 2 Cumulative Groundwater Elevations and Analytical Results <br /> FIGURES <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Figure 3 Soil Cross Section Maps <br /> Figure 4 Soil Analytical Results March 8, 2000 <br /> Figure 5 Groundwater Contour Map, March 9, 2000 <br /> Figure 6 Groundwater Analytical Results,March 8 and 9, 2000 <br /> APPENDICES <br /> Appendix A Clearwater Field Procedures <br /> Appendix B Clearwater Soil Boring and Well Construction Logs <br /> Appendix C Clearwater Gauge Data/Purge Calculations, Well Development and Well Purging <br /> Sheets <br /> Appendix D Laboratory Reports and Chain-of-Custody Forms <br /> Appendix E Perrnits <br />
The URL can be used to link to this page
Your browser does not support the video tag.