Laserfiche WebLink
Well Surveying <br /> All well elevations are surveyed at the north side of the top of casing to the nearest±0 01 foot The exact survey <br /> point(at the center of the survey rod or,if the casing stub is uneven, the point of contact between casing and rod)is <br /> clearly marked and maintained on the casing rim. Elevations are referenced either to mean sea level or to a project <br /> datum A project datum is typically chosen so as to minimize the possibility of its' later disturbance For instance, <br /> fire hydrants are commonly selected Where required,the wells are surveyed by a licensed land surveyor,relative to <br /> mean sea level <br /> Groundwater Sampling <br /> Groundwater Monitoring <br /> Prior to beginning, a decontamination area is established Decontamination procedures consist of scrubbing <br /> downhole equipment in an Alconox® solution wash (wash solution is pumped through any purging pumps used), <br /> and rinsing in a first rinse of potable water and a second rinse of potable water or deionized water if the latter is <br /> required. Any non-dedicated down hole equipment is decontaminated prior to use <br /> Prior to purging and sampling a well, the static water level is measured to the nearest 0 01 feet with an electronic <br /> water sounder Depth to bottom is typically measured once per year, at the request of the project manager, and <br /> during Clearwater's first visit to a site If historical analytical data are not available with which to establish a <br /> reliable order of increasing well contamination, the water sounder and tape will be decontaminated between each well <br /> If floating separate-phase hydrocarbons (SPH) are suspected or observed, SPH is collected using a clear, open-ended <br /> product bailer, and the thickness is measured to the nearest 0 01 feet in the bailer SPH may alternatively be <br /> measured with an electronic interface probe Any monitoring well containing a measurable thickness of SPH before <br /> or during purging is not additionally purged and no sample is collected from that well Wells containing a <br /> hydrocarbon sheen are sampled unless otherwise specified by the project manager Field observations such as well <br /> integrity as well as water level measurements and floating product thicknesses are noted on the Gauging Data/Purge <br /> Calculations form <br /> Well Purace <br /> Each monitoring well to be sampled is purged using either a PVC bailer or a submersible pump Physical <br /> parameters (pH,temperature and conductivity)of the purge water are monitored during purging activities to assess if <br /> the water sample collected is representative of the aquifer If required, parameters such as dissolved oxygen, turbidity, <br /> salinity etc are also measured Samples are considered representative if parameter stability is achieved Stability is <br /> defined as a change of less than 0 25 pH units, less than 10% change in conductivity in micro mhos, and less than <br /> 10 degree centigrade (1 8 degrees Fahrenheit) change in temperature Parameters are measured in a discreet sample <br /> decanted from the bailer separately from the rest of the purge water Parameters are measured at least four times <br /> during purging, initially, and at volume intervals of one well volume Purging continues until three well casing <br /> volumes have been removed or until the well completely dewaters Wells which dewater or demonstrate a slow <br /> recharge, may be sampled after fewer than three well volumes have been removed Well purging information is <br /> recorded on the Purge Data sheet All meters used to measure parameters are calibrated daily Purge water is sealed, <br /> labeled, and stored on site in D Q T-approved 55-gallon drums After being chemically profiled, the water is <br /> removed to an appropriate disposal facility by a licensed waste hauler <br /> GmundwateK Sample Collection <br /> Groundwater samples are collected immediately after purging or,if purging rate exceeds well recharge rate, when the <br /> well has recharged to at least 80% of its static water level If recharge is extremely slow, the well is allowed to <br /> recharge for at least two hours, if practicable, or until sufficient volume has accumulated for sampling The well is <br /> sampled within 24 hours of purging or repurged Samples are collected using polyethvlene bailers, either disposable <br /> or dedicated to the well Samples being analyzed for compounds most sensitive to volatilization are collected first <br /> Water samples are placed in appropriate laboratory-supplied containers, labeled, documented on a chain of custody <br /> form and placed on ice in a cooler for transport to a state-certified analytical laboratory Analytical detection limits <br /> match or surpass standards required by relevant local or regional guidelines <br /> CLEARWATER GROUP,INC (W1/GWS) 3 revised September 30, 1999 <br />