Laserfiche WebLink
12 December 1995 <br /> AGE-NC Project No. 95-0184 <br /> Page 6 of 6 <br /> 3. Results of the SVE pilot test will be used to determine feasibility of soil vapor extraction at <br /> the site. <br /> 4.4. REPORT PREPARATION <br /> Upon completion of the pilot test and laboratory analyses, a Corrective Action Plan(CAP)will be <br /> prepared summarizing results of the work performed. The CAP will include recommendations for <br /> remediation of impacted soil and ground water at the site and, if necessary, further investigation. The <br /> report will be reviewed and signed by a California Registered Geologist. <br />