Laserfiche WebLink
... `s <br /> 22 February 2006 <br /> AGE-NC Project No. 95-0184 <br /> Page 2 of 2 <br /> • Installation of one deep monitoring well (Hydrogeologic unit 4 at 110-120 feet bsg), at the <br /> location of well MW-1 (east of former Tank A-UST#I area)(Figures A and B). <br /> • Installation of one deep monitoring well(Hydrogeologic unit 4 at 110-120 feet bsg),east of <br /> the well MW-4 and near the former UST #2 location, on the southern sidewalk area <br /> (Figure Q. <br /> • Installation of one shallow monitoring well(Hydrogeologic unit 1 at 30-50 feet bsg),east of <br /> the former UST#2 location and near the location of CPT-3, on the southern sidewalk area <br /> (Figure Q. <br /> Procedures for the proposed wells will follow those already approved by the EHD,documented from 1 <br /> previously submirrPrl v nrk nta Monitoring and sampling will be conducted quarterly on the / <br /> proposed monitoring wells by procedures previously approved.Jour. n 0,k Le fes, . <br /> �o i <br /> Upon Environmental Health Department's approval of this work plan, AGE will submit two <br /> necessary permits (two separate parceled areas - assessor map attached) and permit fees to your <br /> office.If you have any questions or require further information,please contact me at(209)467-1006. <br /> Sincerely, <br /> E�gS\OWkI Gp0�0 <br /> Advanced GeoEnviron mental, I <br /> No. 7473 t <br /> William R. Little sf \a <br /> Senior Project Geologist 9 of eA�\FOQ� <br /> California Professional Geologist 7473 <br /> i <br />