My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT
>
308
>
2900 - Site Mitigation Program
>
PR0542014
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 5:32:07 PM
Creation date
1/16/2020 4:05:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0542014
PE
2960
FACILITY_ID
FA0023306
FACILITY_NAME
LARRYS AUTO REPAIR
STREET_NUMBER
308
Direction
N
STREET_NAME
GRANT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
308 N GRANT ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06 November 2006 <br /> AGE-NC Project No. 95-0184 <br /> Page 4 of 6 <br /> Laboratory reports for vapor sample analysis,testing methods, laboratory quality assurance/quality <br /> control(QA/QC)reports,and sample chain of custody documentation will be presented in quarterly <br /> reports. <br /> 2.6. REPORT PREPARATION <br /> uarterl reports will be prepared to present the findings of the SVE interim activities. Quarterly <br /> reports will inc We a description o(`worTc performed with the results of the nfTiient and effluent <br /> vapor samples.Conclusions and recommendations will be included in the reports if applicable. The <br /> report will be in a format acceptable to RWQCB guidelines, reviewed and signed by a California <br /> Professional Geologist and submitted to the GeoTracker database. <br /> 3.0. FIELD PROCEDURES <br /> The proposed location of the SVE unit will be in the vicinity of the northern section of the site <br /> (Figure 2),which will allow the property owners of the Larry's Auto site to conduct their day to day <br /> business without interference from the operation of the SVE remediation system.The SVE interim <br /> remediation system will be secured by a chain-linked, gated enclosure approximately 6 feet wide, <br /> 15 feet long and six feet high.A dedicated electrical meter will be installed to connect directly to the <br /> SVE unit. <br /> All field procedures will be overseen by an AGE representative under the supervision of a California <br /> Professional Geologist. Procedures for SVE system installation, underground piping installation, <br /> start-up period, and weekly/monthly operation and maintenance procedures are described below. <br /> 3.1. PERMITTING <br /> An Authority To Construct and Permit to Operate application for a site-specific permit will be <br /> submitted to the SJVAPCD prior to initiation of the remediation project. In addition, required <br /> permits will be obtained from the COSPWD, including electrical installations. A minimum of 48 <br /> hours notice will be given to the SJCEHD prior to performing any field work requiring an EHD <br /> inspection. <br /> 3.2. REMEDIATION SYSTEM PIPING NETWORK <br /> A network of two-inch diameter, schedule 40 PVC piping will be installed from the remediation <br /> Advanced GeoEnvironmeotal,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.