Laserfiche WebLink
V.000 <br /> 28 February 2006 <br /> AGE-NC Project No. 95-0184 <br /> Page 2 of 2 <br /> • Installation of one deep monitoring well (Hydrogeologic unit 3 at 95-100 feet bsg), at the <br /> former UST#1 location. <br /> • Installation of one deep monitoring well (Hydrogeologic unit 3 at 95-100 feet bsg), east of <br /> the well MW-4 and near the former UST#2 location, on the southern sidewalk area. <br /> • Installation of one shallow monitoring well(Hydrogeologic unit 1 at 30-50 feet bsg),east of <br /> the former UST#2 location and near the location of CPT-3,on the southern sidewalk area. <br /> Procedures for the proposed wells will follow those already approved by the EHD,documented from <br /> previously submitted work plans. Monitoring and sampling will be conducted quarterly on the <br /> proposed monitoring wells by procedures previously approved. <br /> Upon Environmental Health Department's approval ofthis work plan,AGE will submit all necessary <br /> permits and permit fees to all appropriate regulatory agencies. If you have any questions or require <br /> further information, please contact me at (209)467-1006. <br /> Sincerely, <br /> G <br /> o��g5\O <br /> M <br /> Ep�O� <br /> Advanced GeoEnvironmental, I <br /> No. 7473 <br /> William R. Little <br /> Senior Project Geologist OF CP��F�Pa\P <br /> California Professional Geologist 7473 <br />