Laserfiche WebLink
10 November 2005 <br /> AGE-NC Project No. 95-0184 <br /> Page 2 of 2 <br /> 3.1. SOIL VAPOR EXTRACTION PILOT TEST <br /> For performance of an SVE pilot test,a portable internal combustion(IC)system will�be set-up on- <br /> site and operated for a period of 8 to 10 hours.The unit will be used to apply a vacuum ars)ibxttraction <br /> well, <br /> �sroposed vapor wells VW-5A and B. <br /> a / u/ <br /> The induced vacuum will be measured at multiple SVE wells and several monitoring wells t1K <br /> throughout the site. Additionally, the vapor concentrations from the extraction wellSground water <br /> depths and others SVE unit parameters (operation speed, air flow and vacuum) will be measured <br /> during the SVE pilot test. The extraction well vacuum, induced vacuum at monitoring points, <br /> extracted hydrocarbon concentrations and extraction flow rate will be measured at 30 minute <br /> intervals throughout the test.The data will aide to estimate the relative subsurface permeability for C— <br /> vapor extraction,radius of influence of the vapor extraction well and the initial hydrocarbon recovery <br /> rate.Monitoring data from observation wells and the extraction well will be collected on field logs. <br /> Data will facilitate in the design of the SVE system and will be used to determine the number of– p <br /> vapor wells, the spacing of the wells and the selection of vapor remediation system (e.g. internal <br /> combustion,thermal oxidation, catalytic oxidation). <br /> Four vapor samples will be collected from the extraction well6during the test. Samples will be <br /> collected at approximately two hour intervals.The samples will be collected in Tedlar bags,within <br /> a vacuum chamber and stored in a cool container and transported under chain-of-custody to a DHS- <br /> certified laboratory for analysis. Each vapor sample will be analyzed for: <br /> • Total petroleum hydrocarbons quantified as gasoline (TPH-g) and diesel (TPH-d) in <br /> accordance with EPA Method 8015 Modified/5030; <br /> • Volatile aromatics (benzene, toluene, ethylbenzene and xylenes: BTEX) and Fuel <br /> oxygenates; di-isopropyl ether (DIPE), ethyl tertiary-butyl ether (ETBE), MTBE, tertiary- <br /> amyl methyl ether (TAME) and tertiary butanol (TBA) in accordance with EPA Method <br /> 8260. <br /> 3.2. REPORT PREPARATION <br /> Procedures and findings of the SVE pilot test will be analyzed within a feasibility report prepared <br /> in conjunction with the additional ground water extraction pilot tests proposed for the site. Results <br /> of feasibility studies may also be detailed in a Corrects ev Action Plan(CAP).The CAP will provide <br /> an analysis of feasibility testing and include recommendations for soil and ground water remediation <br /> at the site. The reports will be in a format acceptable to the EHD and will be reviewed and signed <br /> by a California Professional Geologist. <br /> Advanced GeoEnvironmencal,Inc. <br />