Laserfiche WebLink
V •� <br /> Work Plan Addendum <br /> LARRY'S AUTO <br /> 308 North Grant Street, Stockton, California <br /> 1.0. INTRODUCTION <br /> At the request of Mr. Charles Skobrak,Advanced GeoEnvironmental,Inc. (AGE)has prepared this <br /> work plan addendum for 308 North Grant Street, Stockton, California(site). The revised scope of <br /> work includes the advancement of an additional ground water extraction well and associated <br /> pumping test. The location of the site is illustrated on Figure 1. A plan of the site is illustrated on <br /> Figure 2. Additional site background information is provided in Appendix A. <br /> The San Joaquinunty Environmental Health Department (EHD) has directed by letters dated <br /> and August 2005 that revisions be considered for the AGE-prepared Well Installation <br /> 2�oe4 and Feasibility Study Work Plan-November 2004, dated 19November2004(AGE,November2004) <br /> and that a work plan addendum be prepared (Appendix B). This work plan has been prepared in <br /> accordance with Central Valley Regional Water Quality Control Board(RWQCB)guidelines for the <br /> investigation of underground storage tanks(UST) sites. <br /> AGE concurs with the EHD's recommendation for an additional extraction well (EW-2), to be <br /> placed near the proposed extraction well EW-I.The additional well is to be advanced to a total depth <br /> of 73 feet below surface grade (bsg); the screen interval would be placed at approximately 58 feet <br /> to 73 feet bsg (Figure 2). <br /> AGE concurs with the EHD's recommendation to conduct continuous core samples in the proposed <br /> screen locations to assure proper placement of screen intervals. <br /> AGE concurs with the EHD's recommendation to complete an appropriate pump test on the second <br /> discrete screened extraction well. <br /> 2.0 SCOPE OF WORK <br /> The proposed changes to the original work plan (AGE, November 2004) are as follows: <br /> • An additional extraction well EW-2 will be installed near the first extraction well (EW-1); <br /> installation procedures shall be as described in the November 2004 AGE workplan.The well <br /> will be installed to a depth of 73 feet bsg, and screened from 58 feet to 73 feet bsg. <br /> • The original work plan proposed that the soil encountered in the pilot boring will be <br /> collected at five foot intervals using a California modified split-spoon sampler fitted with <br /> three 2-inch diameter, 6-inch long brass sleeves. At the request of the EHD,the pilot borings <br /> will be sampled continuously through the zones of lithologic interest for the screen <br /> placement in each well. This will be done by sampling at approximately two foot intervals <br /> Advanced GeoEnvironmental,Inc. <br />