Laserfiche WebLink
.,/ <br /> 29 September 2005 <br /> AGE-NC Project No. 95-0184 <br /> Page 2 of 2 <br /> with the California split spoon sampler. <br /> • A similar pump test will be performed on EW-2 as was described in November 2004 work <br /> plan.The goal of maximum sustained draw-down at this well location will not be as relevant <br /> as in EW-1, as one would not want draw down in EW-2 as to inhibit the use of EW-1; <br /> finding a pumping rate which will allow both wells to be used simultaneously will be the <br /> primary goal at EW-2. <br /> Figure 3 depicts the proposed EW-2 ground water extraction well construction.All other field work <br /> will be performed as described in the November 2004 AGE work plan unless noted above. <br /> Advanced GeoEnvironmeahl,Inc. <br />