My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012704
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
500
>
2900 - Site Mitigation Program
>
PR0503286
>
ARCHIVED REPORTS_XR0012704
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2020 1:19:02 PM
Creation date
1/17/2020 10:49:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012704
RECORD_ID
PR0503286
PE
2953
FACILITY_ID
FA0005766
FACILITY_NAME
MOBIL OIL BULK PLANT
STREET_NUMBER
500
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25027008
CURRENT_STATUS
01
SITE_LOCATION
500 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. m <br /> S <br /> color, and soil type on the boring logs. The boring logs <br /> will be reviewed by a project geologist and a civil engineer <br /> who is registered and/or certified in the State of <br /> California. <br /> u <br /> All samples collected will be properly <br /> Eachhandled <br /> sam le willrbence <br /> with the California DOHS guidelines. P <br /> properly labeled in the field and immediately stored in <br /> laboratory supplied coolers and preserved with blue or dry <br /> ice for transport to a California-certified laboratory for <br /> analysis. <br /> The official chain of custody record accompanies the samples <br /> and includes the site and sample <br /> analysismpedentification, ate and <br /> date <br /> the name <br /> time of sample collection, <br /> and signature of sampler. When transferring the possession <br /> the transferee signs, dates, and indicates <br /> of the samples, <br /> the time on the chain of custody record. The field sampler <br /> will properly package and dispatch ths samples <br /> to thethe <br /> appropriate laboratory for analysis, <br /> sample is properly preserved. <br /> GLQU st uc io <br /> The number, location, and depths of the ground water <br /> monitoring wells will be selected prior to commencement of <br /> work, and may require relocation or modification as the work <br /> proceeds. The ground water wells will be constructed of <br /> Schedule 40 PVC blank <br /> clean, 2-inch--diameter, flush-threaded, _ <br /> casing which extends from grade leVelto ano a depthdestimated at <br /> the highest anticipated water levl, and extending to a <br /> iameter <br /> screened casing with 0.020-inch perforations, <br /> depth of at least 10 feet into the <br /> water <br /> ofable.welle casings, <br /> fittings, screens, and other comp <br /> construction will be thoroughly steam cleaned before <br /> installing the well. <br /> The annular space surrounding the screened portion twoill be <br /> backfilled with No. 3 Monterey sand ofneescreened section. <br /> approximately 2 feet above the top 1-fact thick) will be <br /> A bentonite annular seal (approximately <br /> placed above the filter pack. The remaining annulus will be <br /> grouted with neat cement to the surface. <br /> minimize nt well boxes <br /> will be installed slightly above 9 waterti ht well <br /> infiltration of surface waters. Locking, g <br /> e the integrity of the well. <br /> caps will be installed to ensur <br /> u <br /> We Devolgnment <br /> New ground water monitoring wells will be developed to clean <br /> the well and stabilize the sand, gravel, and aquifer <br /> materials around the perforated section of the well. Well <br />
The URL can be used to link to this page
Your browser does not support the video tag.