My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012704
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
500
>
2900 - Site Mitigation Program
>
PR0503286
>
ARCHIVED REPORTS_XR0012704
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2020 1:19:02 PM
Creation date
1/17/2020 10:49:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012704
RECORD_ID
PR0503286
PE
2953
FACILITY_ID
FA0005766
FACILITY_NAME
MOBIL OIL BULK PLANT
STREET_NUMBER
500
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25027008
CURRENT_STATUS
01
SITE_LOCATION
500 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
development will be conducted using one of several acceptable <br /> methods, such as bailing, mechanical or air lift pumping, <br /> ntl the <br /> surging, or swabbing. Weledandlifmpossible,nfreeuofisand, <br /> well is thoroughly develoQd <br /> silt, and turbidity, <br /> The water generated from the development process will be <br /> placed into labeled 55-gallon drums, pending <br /> results of the ground water samples, to determine the <br /> appropriate disposal method. Disposal of the water will <br /> conform to applicable hazardous waste requirements. <br /> ing <br /> prior to well sampling, the ground water level will be <br /> measured from anenorth electriclm Of waterthe levelpsensor. PVC <br /> Thewall <br /> well was <br /> casing, using product, <br /> using <br /> monitored for the presence/absence of floating p <br /> a clear bailer. <br /> ive of <br /> To ensure that the 9owiilwater <br /> purgedlofl4 to loswell tcasing <br /> the aquifer, the wellur in will be <br /> volumes before sample collect- pon um Thepurging <br /> purging, the <br /> accomplished using a bailer orlp apdescription of the initial <br /> sampler notes the following: ( (21 pH, temperature, and <br /> discharge of the ground water; volume <br /> conductivity readings at recharge5 or 10 grates.allon rntervals; (3) <br /> of water purged; and (4) <br /> The ground water samples will be collected using a steam <br /> cleaned Teflon bailer, and then decanted into the appropriate <br /> The sampler wears nitrile <br /> laboratory supplied containers. <br /> nd well sampling. <br /> gloves at all times during purging a <br /> The water samples will be handled and preserved in accordanc <br /> with Regional Water Quality Control Board (RWQCB) guidelines. <br /> The samples will be clearly labeled with the well number, <br /> site identification, date and time of sample collection, and <br /> sampler's initials, and will 5e aported to a chain of custody California- <br /> roper <br /> laboratory fallowin p <br /> protocol. <br />
The URL can be used to link to this page
Your browser does not support the video tag.