My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011565
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
500
>
2900 - Site Mitigation Program
>
PR0503286
>
ARCHIVED REPORTS_XR0011565
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2020 12:41:44 PM
Creation date
1/17/2020 11:19:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011565
RECORD_ID
PR0503286
PE
2953
FACILITY_ID
FA0005766
FACILITY_NAME
MOBIL OIL BULK PLANT
STREET_NUMBER
500
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25027008
CURRENT_STATUS
01
SITE_LOCATION
500 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE SAFETY PLAN <br /> All field procedures and activities related to the conduct of <br /> the site investigation work will be in accordance with the <br /> site specific safety plan to be developed for the project . <br /> The site safety plan will be developed in compliance with <br /> applicable requirements of the California Department of <br /> Health Services and the Federal and State Occupational Safety <br /> and Health Administration (OSHA and Cal-OSHA) . <br /> IMPLEMENTATION SCHEDULE <br /> The site investigation work proposed herein will be completed <br /> and a report submitted within 75 days after receipt of <br /> written approval of the proposed scope of work for <br /> supplemental site investigation/characterization. The <br /> schedule for completion of major activities or tasks is as <br /> follows : <br /> Estimated Days <br /> B.CtiYitY After -WoXk Plan Approval <br /> Permitting 10 <br /> Qualitative Water Survey 25 <br /> Monitoring Well Installation 45 <br /> Develop, Sample, and Survey 35 <br /> Laboratory Analysis 50 <br /> Data Analysis and Report Preparation 75 <br /> This schedule may be subject to revision depending on timely <br /> receipt of work plan approval and information required to <br /> complete the site investigation. Any changes to the schedule <br /> will be communicated in advance to the appropriate agencies <br /> and parties involved. <br /> RESPONSIBLE PARTIES <br /> Responsible parties involved with the site investigation <br /> and installation of the tank monitoring system are: <br /> o Mobil Oil Corporation <br /> 3800 West Alameda Ave. , Suite 700 <br /> Burbank, CA 91505-4331 <br /> Contact: Mr. Mark Ausburn <br /> Environmental Advisor <br /> (818) 953--2568 <br /> i <br /> k <br />