Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for KWIK SERV LODI BW 113* as of October 07, 2020. <br /> Open violations from January 09, 2020 inspection <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#319-Failure to comply with the installation, inspection,or record keeping of the overfill <br /> prevention. <br /> OBSERVATION: The mechanical flapper used as the overfill prevention system on the 87 and diesel UST was <br /> listed as a failure on the 4/17/19 overfill prevention equipment inspection and is not currently functional. <br /> REGULATION GUIDANCE:All UST systems must be equipped with an approved,functional overfill prevention <br /> device at all times during delivery operations. <br /> CORRECTIVE ACTION: Immediately discontinue deposition of petroleum into this tank until the component is <br /> repaired or replaced by a properly licensed, trained, and certified contractor under permit and inspection of the EHD. <br /> If the failed component can't be replaced immediately,there is a possibility that the[GRADE] UST system may be <br /> red tagged to prevent fuel inputs. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 3 of 3 <br />