Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page s of s) <br /> XII. LINE LEAK DETECTOR TESTING <br /> X❑Check this box if line leak detectors(LLD)are NOT installed.(Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? El E] 1:1(Check all that apply.) Simulated leak rate verified: E]3 GPH ❑0.1 GPH E]0.2 GPH <br /> Was the testing apparatus properly calibrated? ❑ ❑ ❑ <br /> For emergency generator tank systems,does the LLD create an audible and visual alarm when a leak is detected? ❑ ❑ ❑ <br /> For mechanical LLDs,does the LLD restrict the flow through the pipe when a leak is detected? ❑ 1 ❑ 1 ❑ <br /> For electronic LLDs,does the turbine automatically shut off when a leak is detected? ❑ I ❑ 1 ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ❑ 1 ❑ 1 ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ❑ ❑ ❑ <br /> For electronic LLDs,have all accessible wiring connections been visually inspected for kinks and breaks? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? ❑ ❑ ❑ <br /> For any answer of"N"above,describe in Section X111 how and when these issues were or will be corrected. <br /> XIII. COMMENTS <br /> XIV. VACUUM 1 PRESSURE I HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ❑ Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type(Mark all that apply.) ❑X Vacuum ❑Pressure ❑Hydrostatic <br /> Sensor ID Component(S)Monitored By This Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> S-1 Bio-Diesel B-99 ❑X Pass ❑Fail X❑Pass ❑Fail <br /> S-2 19-20 Product ❑X Pass ❑Fail X❑Pass ❑Fail <br /> S-3 21-30 Product ❑X Pass ❑FailX❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail 1 ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail I ❑Pass ❑Fail <br /> ❑Pass ❑Fail I ❑Pass ❑Fail <br /> ❑Pass ❑Fail I ❑Pass ❑Fail <br /> ❑Pass ❑Fail I ❑Pass ❑Fail <br /> [:]Pass ❑Fail 1 ❑Pass ❑Fail <br /> How was interstitial communication verified? X Simulated Leak at Far Ends of the Interstitial Space ❑Visual Inspection <br /> Other Describe the method in section XV below. Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑X Yes ❑No(Describe the reason in section XV below.) <br /> For any answer of"Fail"above, describe In Section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH=Gallons Per Hour,Y=Yes,N=No,NA=Not Applicable,VPH=VaanurYPressureVHydrostatic,ID=Identification <br />