Laserfiche WebLink
6/11.2015 Pilot Flying J#l618 Ripcm Site Map <br /> UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION <br /> UST Monitoring Site Plan <br /> Site Address: Pilot Flying J — 1501 N. Jack Tone Rd., Ripon CA <br /> I Roan <br /> o=Mpwiw <br /> P-MOMUF16 CUM A'e.d <br /> S-S_am <br /> STP-luDh'-eSunv <br /> F=HI Wcke <br /> V-Vas Hu!m <br /> M-ALWm bV lent Jso <br /> TS-Tmmrkxj!m..I V <br /> L-LMC_eal00t0�U <br /> PjLir a <br /> Vent LMer- —•— <br /> �. Vep.LI:e- — — <br /> A CAS-:7eni.At Saxiath <br /> VT=Vat LM m <br /> emsawk snws&A i wwwbomw/Lor <br /> ledtDefl:Nf <br /> J i4P� Fv 51 <br /> 14 <br /> ♦Y <br /> Y Le <br /> AOI l: <br /> ,a a <br /> r <br /> Fy ip I r <br /> � Y <br /> Y <br /> LO <br /> A <br /> 91Dy81E1 <br /> L11gifle <br /> WW 11�2 LV <br /> br- L1. <br /> LCt <br /> Date map was drawn: <br /> Instructions <br /> If you already have a diagram that shows all required intormation, you may include it, rather than this page, witn your <br /> Monitoring System Certification. On your Site plan, show the general layout of tanks and piping.Clearly identify <br /> locationsof the following equipment, it installed: monitoring system control panels, sensors monitoring tank annular <br /> spaces,sumps,dispenser pans,spill containers,or other secondary containment areas; mechanical or electronic line <br /> leak detectors; and in-tank liquid level probes(if used for leak detection). In the space provided,note the date this Site <br /> Plan was prepared. <br /> https�/www.glitty.con/9DttTil5,329784"? xe=&app=lb50-44b0-6042-1le2-tide}-0800200c;9ao6&cL-v=false 113 <br />