My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2072
>
2300 - Underground Storage Tank Program
>
PR0231426
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 8:05:52 AM
Creation date
1/17/2020 2:36:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231426
PE
2361
FACILITY_ID
FA0004625
FACILITY_NAME
NATIONAL PETROLEUM MANTECA
STREET_NUMBER
2072
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
22202001
CURRENT_STATUS
01
SITE_LOCATION
2072 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for NATIONAL PETROLEUM MANTECA as of December 16, <br /> 2020. <br /> Open violations from September 21, 2020 inspection <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#210-No employee present that were trained in the operation and maintenance of the UST system <br /> by a DO. <br /> OBSERVATION: The designated operator employee training for Pavitor Singh was not performed. <br /> REGULATION GUIDANCE: The designated operator shall train facility employees in the proper operation and <br /> maintenance of the UST system at least once every 12 months. The training shall be conducted before the <br /> individual performs the duties of a facility employees.The training shall include, but is not limited to: <br /> 1. Operation of the UST system in a manner consistent with the facility's best management practices <br /> 2. Employee's role with regard to monitoring equipment as specified in the facility's monitoring plan <br /> 3. Employee's role with regard to spills and overfills as specified in the facility's response plan <br /> 4. Name of the contact person(s)for emergencies and monitoring equipment alarms <br /> Initial training shall also include a site-specific practical demonstration that provides both sharing information and <br /> evaluating knowledge for responding to emergencies, leak detection, monitoring alarms, spills and overfills. At least <br /> one of the facility employees present during operating hours shall have current training. <br /> CORRECTIVE ACTION: Ensure that employees have been trained by the designated operator, maintain the list on <br /> site, and submit a copy of the training records to the EHD. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#304-Failure to construct,operate,and maintain primary containment as product-tight. <br /> OBSERVATION: Large amount of oily liquid was observed in UDC 5/6, indicating a leak in the primary containment. <br /> REGULATION GUIDANCE:All primary containment for the UST system must be product tight. <br /> CORRECTIVE ACTION: Immediately have a properly licensed,trained, and certified contractor repair or replace the <br /> failed component(s), under permit and inspection of the EHD if necessary. <br /> Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.