Laserfiche WebLink
..... _.. �._ <br /> ARCADIS Ms. Kristi Shelton <br /> November 12,2009 <br /> Task:5: Reporting <br /> • Prepare a letter report summarizing the field activities and analyticalresults. <br /> A hard copy of the report will be "submitted to the Regional Board'and San <br /> Joaquin County Environmental Health Department approximately four weeks <br /> after receiving the final analytical results. The report and analytical results <br /> will also be submitted electronically to the State Water Resources Control <br /> Board's GeoTracker database. <br /> Schedule <br /> ARCADIS will begin access negotiations with Delta Blood Bank upon receiving <br /> approval of this proposed scope of work from the Regional Board. Scheduling and <br /> conducting the field. activities is estimated to take approximately five weeks Jo <br /> complete but is dependent on securing an access agreement. <br /> If you have any questions regarding this Addendum, please contact' me at <br /> 714.730.9052 Ext 3$. <br /> c Ros rssia� <br /> Sincerely, ��_ N C, R� <br /> ARCADIS � z <br /> No,57358 <br /> Allen C.Just, P.E. <br /> Principal Engineer ?.°1 cnO�a ` <br /> Attachments <br /> Table 1 Well Construction Details <br /> Table 2 Soil Boring Analytical Results <br /> Table 3 -Groundwater Analytical Results <br /> Figure 1 -Site Plan <br /> Figure 2 -Proposed Boring Locations <br /> Attachment A -Regional Board Letter dated September 17, 2009 <br /> Attachment B -EDR Radius Map Report . <br /> Attachment C -1991 and 1996 Well Searches <br /> Attachment D -Geologic Cross Sections <br /> Copies: <br /> Laurel Wimmell, Chevron EMC, San Ramon, CA <br /> Mike-Infurna, San Joaquin County Environmental Health Department, Stockton, CA <br /> Page: <br /> G..t/;ar WLEMChswm O&M1 wA WWACba sReporl Ad*nUntCWM RaponAOM(km_t 1,12.M.dw '�/` <br />