Laserfiche WebLink
FEB-04-1999 10:29 MDM P.03 <br /> Louis Moresco,jr. Liquidati g Trust -2- February 2, 1999 <br /> P1tE=APPROVALY$REAKn-OWN—_ <br /> - <br /> Task Amount Pre-Approved Comments <br /> Project Prcparation $810 <br /> BoreholeAVell install&Lo $7015 <br /> Laboratory Analyses (BTE , $1250 <br /> TPHg, Oxygenates) <br /> Groundwater Monitor $945 <br /> Data Analysis&reporting $1400 <br /> Project Management $640 <br /> TOTAL]PRE-APPROVED $12,060 <br /> • The actual costs and sco a of work performed must be consistent with this pre-approval for it <br /> to remain valid. <br /> + The work products must a acceptable to the County and the Regional Water Quality Control <br /> Board. , <br /> • It is my opinion that it is unnecessary to obtain three bids for this scope of work; the Fund's <br /> three bid requirement is waived for this scope of work. <br /> • Although I have referred to the Geological Technics, Inc,proposal in my pre-approval above, <br /> please be aware that you ill be entering into a private contract: the State of California <br /> cannot compel you to sign any specific contract. This letterPPP <br /> re-a roves the costs as <br /> presented in the proposal dated December 14, 1998 by Geological Technics, luc. for <br /> conducting the work approved by the County for implementing the November 4, 1998, <br /> Geological Technics,Inc workplan. <br /> aHfornla Environmen4d Protection Agency <br /> . ��. Rccysled Paper <br />