My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
385
>
2900 - Site Mitigation Program
>
PR0508441
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2020 1:14:17 PM
Creation date
1/22/2020 1:02:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0508441
PE
2950
FACILITY_ID
FA0008077
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #266
STREET_NUMBER
385
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21449012
CURRENT_STATUS
01
SITE_LOCATION
385 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'i <br /> I <br /> 1 F <br /> • Continue the process until the entire screened interval has been adequately swabbed I <br /> and purge water is relatively clear of fine material. <br /> I <br /> • Contain all purge water in the drums or other containers provided. Denote the date, i <br /> time and origin of the water on the containers. Include calculation of the volume of <br /> water removed from each well and observations of the presence of sediments and j <br /> color/odor of water, etc., in the logbook and on the forms provided. <br /> I <br /> �? Obtain final depth to groundwater level readings from the point of survey mark, or <br /> from the North side of the top of the PVC casing,!)if not point of survey mark is <br /> present. Readings will be measured to the nearesfF 0.01-foot. Denote time and readings <br /> in logbook and on forms'provided. I <br /> • -Conduct final decontamination procedures of any!field equipment that is not <br /> disposable. ' <br /> Close and secure each well upon completion of field activities. Ensure that all water <br /> storage containers are closed and secured and that the site is clean. <br /> li <br /> i <br /> - f <br /> I <br /> i <br /> i - I <br /> ry � <br /> �I <br /> { <br /> v i <br /> i <br /> x i <br /> ��� SOP MW Development 3 January 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.