Laserfiche WebLink
'i <br /> I <br /> 1 F <br /> • Continue the process until the entire screened interval has been adequately swabbed I <br /> and purge water is relatively clear of fine material. <br /> I <br /> • Contain all purge water in the drums or other containers provided. Denote the date, i <br /> time and origin of the water on the containers. Include calculation of the volume of <br /> water removed from each well and observations of the presence of sediments and j <br /> color/odor of water, etc., in the logbook and on the forms provided. <br /> I <br /> �? Obtain final depth to groundwater level readings from the point of survey mark, or <br /> from the North side of the top of the PVC casing,!)if not point of survey mark is <br /> present. Readings will be measured to the nearesfF 0.01-foot. Denote time and readings <br /> in logbook and on forms'provided. I <br /> • -Conduct final decontamination procedures of any!field equipment that is not <br /> disposable. ' <br /> Close and secure each well upon completion of field activities. Ensure that all water <br /> storage containers are closed and secured and that the site is clean. <br /> li <br /> i <br /> - f <br /> I <br /> i <br /> i - I <br /> ry � <br /> �I <br /> { <br /> v i <br /> i <br /> x i <br /> ��� SOP MW Development 3 January 2004 <br />