Laserfiche WebLink
�. 55-gallon drums or other water storage facility <br /> • Well Development Forms <br /> �- 5. Procedure <br /> After completion of monitoring well installation, and no sooner than 48 hours following <br /> w- emplacement of the well seals, the well shall be developed as described below. Prior to <br /> insertion in any well, all equipment will either be decontaminated or will be deemed <br /> clean, or previously un-used,by the manufacturer. <br /> • Open all monitoring wells at the site and allow to equilibrate approximately 15 <br /> minutes. Denote time and visual observations regarding well access, condition, <br /> security, etc. in logbook. <br /> • Obtain initial depth to groundwater level readings from the point of survey mark, or <br /> from the North side of the top of the PVC casing, if not point of survey mark is <br /> present. Readings will be measured to the nearest 0.01-foot. Denote time and readings <br /> in logbook and on forms provided. <br /> • Obtain depth to casing bottom for each well. Readings will be measured to the nearest <br /> 0.01-foot. Denote readings in logbook, and compare with boring log information. <br /> • Calculate the volume of standing water in each monitoring well. Denote the volume <br /> calculated for each well in logbook and/or on forms provided. <br /> • Alternate surging/swabbing of the screened interval and purging of the water: <br /> w.. — Surging/Swabbing: Using either a surge block, the purge pump, or a heavy bailer, <br /> swab the screened portion of the well by lowering the surge equipment to the <br /> bottom of the well, rapidly raising and Iowering the equipment in 2-foot intervals <br /> �- in a plunger-like fashion. This should force water in and out of the screened <br /> interval. Repeat the surge/swab at least 10 times at each 2-foot interval. Then <br /> swab the next two-foot screened interval. Follow each round of surging by <br /> purging. <br /> Purging: Following each round of surging of the screened interval, the well shall <br /> be purged of water. Be sure to lower the bailer to the bottom of the well in order <br /> to "grab" the silts and clays that have settled to the bottom of the well. If a well <br /> has a large portion of fines, then the purging may be performed only using a <br /> w. <br /> bailer, since silts and clays can cause malfunction in the pumps. <br /> • Please note, to develop the entire screened interval,water must be present over <br /> LW the entire length of screen. In wells with little water or with very poor recharge, <br /> distilled water may be added to the well to ensure adequate development of the <br /> well. If water is added, the volume of water added must be documented, and the <br /> water being used should be sampled for the presence of contaminants. <br /> ti.. <br /> SOP MW Development 2 January 2004 <br /> L. <br />