My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
385
>
2900 - Site Mitigation Program
>
PR0508441
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2020 1:14:17 PM
Creation date
1/22/2020 1:02:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0508441
PE
2950
FACILITY_ID
FA0008077
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #266
STREET_NUMBER
385
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21449012
CURRENT_STATUS
01
SITE_LOCATION
385 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> f <br /> URS <br /> Ms. Margaret Lagorio Page 2 <br /> LOP/Site Mitigation Unit <br /> San Joaquin County—Public Health Services <br /> Environmental Health Division <br /> March 16, 2001 <br /> A two-inch diameter groundwater monitoring well will be installed in the boring. The well will be <br /> constructed with five feet of two-inch diameter,Schedule 40,Polyvinyl chloride(PVC)casing with 0.010- <br /> inch machine slots and 25 feet of blank,two-inch diameter,Schedule 40 PVC casing. The slotted casing 4 <br /> will be installed in the bottom of the boring to assess the vertical extent of the groundwater contamination. <br /> The groundwater monitoring wells will be installed according to the procedures outlined in the URS { <br /> Workplan for Environmental Services at the California Highway Patrol Facility Located at 385 <br /> West Grantline Road in Tracy, California, dated March 13, 2000. <br /> } <br /> Following installation of the new wells,they will be surveyed to the same datum as the original three <br /> monitoring wells. The new wells will also be developed and incorporated into the next round of sampling. <br /> Development procedures will follow those outlined in the above mentioned workplan dated March 13, <br /> 2000. <br /> If you have any questions or require additional information,please contact Mr.Philip Cox at(916)679-2261. <br /> Sincerely, <br /> URS Corporation <br /> Philip Cox <br /> Project Manager <br /> s <br /> t <br /> Attachment I - Proposed Monitoring Well Location Map <br /> cc: Mr. A.K. Jain, RESD <br /> Ms.Ligaya Reyes-Ibanez } <br /> Mr. Homer Lin, RESD 1 <br /> Project File <br /> 11Sacdata2lWprocess114214102_Tracy"31601.wpd <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.