My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
385
>
2900 - Site Mitigation Program
>
PR0508441
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2020 1:14:17 PM
Creation date
1/22/2020 1:02:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0508441
PE
2950
FACILITY_ID
FA0008077
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #266
STREET_NUMBER
385
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21449012
CURRENT_STATUS
01
SITE_LOCATION
385 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE-SPECIFIC HEALTH AND SAFELAN Nw� SSHP <br /> SITE INVESTIGATION AND REMEDIATION DESIGN 06/13/00 <br /> URS Greiner Woodward Clyde,Inc. Page 2 <br /> RESD Contract No. 3014214 <br /> A. SITE INFORMATION <br /> Project Name: RESD Site Investigation and Remediation Design (SURD) <br /> Project Number: 41-03014214.02.02000 <br /> Location: 385 W. Grantline Rd. Tracy,CA <br /> Client: California Real Estate Services Division(RESD) <br /> SHSP Prepared By: Phil Cox Date: 06/13/00 <br /> Project Start Date: June 21,2000 <br /> B. SITE DESCRIPTION (8 CCR§5192[C][41) <br /> Facility History: Four borings were installed in March 1999 surrounding the gasoline <br /> UST. Pour soil samples were analyzed for TPH-G/BTEXIMTBE. <br /> TPH-G and BTEX were ND. MTBE was detected between 0.004 and <br /> 0.093 mg/kg. <br /> General Site Description: The site is generally flat and paved with asphalt or concrete. It is <br /> currently occupied by the CHP. <br /> C. PROJECT OBJECTIVES (8 CCR§5192[C][4][B]) <br /> Description of Work <br /> Activities Planned: Drill and install three groundwater monitoring wells to approximately 15 <br /> feet bgs. The drilling method will be hollow stem auger. <br /> D. PROJECT ORGANIZATION(8 CCR§5192[B][2]) <br /> ✓ Responsibility Training <br /> (check if (see HSP Section 3.0 for (see HSP Section 8.0 for training <br /> Team Member assigned) personnel responsibilities) requirements) <br /> Project Manager(PM) 40-hr. H&S(HAZWOPER)Training <br /> Phil Cox ✓ Site Safety Coordinator(SSC) 8-hr H&S Refresher(exp.10/07/00) <br /> H&S Supervisor Training <br /> SSC-Designee 40-hr.H&S (HAZWOPER)Training <br /> Peter Crispell Geologist 8-hr H&S Refresher(exp.7/14/00) <br /> H&S Supervisor Training <br /> Geologist 40-hr.H&S(HAZWOPER)Training <br /> 8-hr H&S Refresher(exp.2/16/00) <br /> Steve Ball SSC-Designee H&S Supervisor Training <br /> Field Technician First Aid/CPR(exp. t 1/05100) <br /> Geologist 40-hr. H&S(HAZWOPER)Training <br /> Martin Fahning ✓ SSC-Designee 8-hr H&S Refresher(exp.2/16/00) <br /> Field Technician H&S Supervisor Training <br /> MSW-1:114214102_Tracylhasp.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.