My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
385
>
2900 - Site Mitigation Program
>
PR0508441
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2020 1:14:17 PM
Creation date
1/22/2020 1:02:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0508441
PE
2950
FACILITY_ID
FA0008077
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #266
STREET_NUMBER
385
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21449012
CURRENT_STATUS
01
SITE_LOCATION
385 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE-SPECIFIC HEALTH AND SAFETS'OLAN SSHP <br /> SITE INVESTIGATION AND REMEDIATION DESIGN 06/13/00 <br /> URS Greiner Woodward Clyde,Inc. Page 5 <br /> RESD Contract No.3014214 <br /> Underground Utilities(Provide the following information): <br /> Utility Location Service: USA <br /> Name of Contact: <br /> Phone Number: 1(800) 642-2444 <br /> Precautions to be Taken: USA will be notified of drilling operations at least 48 hours in advance <br /> of drilling activities. On site personnel will also be contacted and <br /> requested to provide drawings of subsurface utilities and objects (i.e., <br /> sumps or tasks). <br /> G. SITE CONTROL(8 CCR§5192[d]) <br /> Work Zones will be established at the SURD Project site as necessary (see HSP Subsection 6.2 for <br /> procedures and requirements for establishing work zones). <br /> Site Security: on-site security will be maintained by: <br /> Temporary Barricades and/or Warning Tape <br /> Security Fence <br /> 24 Hour Security Guard <br /> Other: <br /> H. PERSONAL PROTECTIVE EQUIPMENT(8 CCR§5192[B][41) <br /> Based on an evaluation of potential hazards at the Project work site, the following level of personal <br /> protective equipment (PPE) will be required for the following SURD activities (specify both an initial <br /> level of protection and a more protective level of protection in the event conditions should change). For <br /> further discussion of the PPE and protection levels see HSP Section 5.0. <br /> Level of Protection. <br /> Activity (insert A,B,C D,or Modified D) <br /> Initial Contingency <br /> Site Walk/Mobilization <br /> Drilling Modified D Modified D <br /> Soil Sampling Modified D Modified D <br /> Groundwater Sampling Modified D Modified D <br /> Surface Water Sampling <br /> Sediment Sampling <br /> Site Inspection <br /> Sampling Handling Modified D Modified D <br /> Decontamination Modified D Modified D <br /> Other Activities(List) <br /> MSW-I:%14214102_Tracylhasp.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.