Laserfiche WebLink
' 25 feet mean sea level Currently, the southern portion of the Site, along West Grant Line Road, <br /> is developed with a single story commercial building and adjacent paved parking lot (Figure 2 in <br /> Work Plan) The building was constructed in 2001-2002 and is currently occupied by Sherwin <br /> Williams and other tenants The northern portion of the Site is undeveloped and has an unlined <br /> ' storm water basin with an approximate dimension of 46 feet by 150 feet The soil removed <br /> during the excavation of the storm water basin was spread across the undeveloped portion of the <br /> ' Site creating a grade increase of approximately 2 feet <br /> ' 3.0 DESCRIPTION OF TASKS AND PROJECT ORGANIZATION <br /> ' The field tasks anticipated to be conducted by Treadwell & Rollo and a summary of project <br /> personnel and responsibilities are described in the following sections <br /> 3.1 Description of Tasks <br /> ' • The tasks to beerformed will be conducted at various times and locations as required <br /> p q <br /> throughout the life of the project and may include the following activities <br /> • Drilling and/or sampling soil, groundwater, and air, and <br /> ' • Observing well installation and development activities <br /> ' The level of protection for each task will be based on the potential hazards including exposure to <br /> site contaminants and air monitoring results <br /> 3.2 Protect Personnel and Description of Responsibilities <br /> ' The client, agency contacts, and Treadwell & Rollo project personnel associated with the project <br /> ' are summarized on Table 2 All Treadwell & Rollo personnel assigned to the project will sign <br /> the Agreement and Acknowledgment Sheet (Appendix A) to confirm that they understand and <br /> ' agree to abide by the provisions of the HSP The following Treadwell & Rollo management <br /> Site Health&Safety Plan 2 09/14/03 <br /> tTREADWELL&ROLLO, INC <br />