Laserfiche WebLink
4 KLEINFELDER <br /> CLIENT RESPONSIBILITIES AND ASSUMPTIONS <br /> This proposal and the attached cost estimate are based on the following assumptions <br /> and responsibilities: <br /> • The Kamilos Group will supply Kleinfelder with access to the site and written <br /> owner authorization for the proposed scope of work. <br /> • We anticipate meetings (both formal and informal) will be conducted with the City <br /> of Stockton, Calwater, Inc., land planning team members and PCCPML. Our <br /> attached cost estimate is based upon approximately 250 hours spanning a time <br /> frame from October 2005 to February 2006. If additional time is required by The <br /> Kamilos Group to complete the task of aiding in the preparation of the water <br /> conservation plan and integrated water management plan, then a contract <br /> amendment for increased fees will be required. <br /> • The fee estimate for permits is based on the site being considered one <br /> continuous project by the permitting agency. If the site is broken into individual <br /> parcels by the permitting agency, additional permit fees may be required. <br /> • Deactivation of each well will be required to obtain a water level in each well prior <br /> to sampling. If deactivation of the wells or a suitable water level sounding port is <br /> not available a water level will not be recorded at the time of sampling. <br /> • PCCPML will aid Kleinfelder in activating each well for possible sampling by <br /> providing access. <br /> • Adequate workspace and access will be provided. <br /> • Water generated during the drilling, development, and sampling will be the <br /> responsibility of the client. Purge water will be assumed as non-contaminated, <br /> and as such it will not be contained and will be dispersed to the ground surface <br /> and left on site. <br /> ANTICIPATED SCHEDULE <br /> The anticipated schedule is not meant to be a definitive timetable but instead meant to <br /> provide PCCPML an estimate of the time to complete each task. We will be reviewing <br /> the team schedule provided by PCCPML, looking for where we will integrate into the <br /> overall schedule. Our anticipated schedule is included as Attachment D. <br /> LIMITATIONS <br /> Kleinfelder offers various levels of investigative and engineering services to suit the <br /> varying needs of different clients. Although risk can never be eliminated, more detailed <br /> and extensive investigations yield more information, which may help understand and <br /> manage the level of risk. Since detailed investigation and analysis involves greater <br /> 02001 PROP.ENV/ST05P346R/JDZ:ly Page 10 of 12 <br /> ©2005 Kleinfelder, Inc. December 2, 2005 <br />