My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
4 (STATE ROUTE 4)
>
0
>
2900 - Site Mitigation Program
>
PR0525973
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:09:40 AM
Creation date
1/22/2020 2:46:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0525973
PE
2965
FACILITY_ID
FA0017576
FACILITY_NAME
MARIPOSA LAKES DEVELOPMENT
STREET_NUMBER
0
STREET_NAME
STATE ROUTE 4
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
HWY 4
P_DISTRICT
000
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINFEL® ER <br /> • An assessment of the results with conclusions and recommendations for <br /> additional assessment if warranted. <br /> Upon completion of the construction of the water supply well, testing, and receipt and <br /> review of analytical results, a report will be prepared for client review. The report will <br /> include: <br /> • A description of Feld activities, observations, and protocols; <br /> • Results of the sample analysis with copies of certified analytical laboratory <br /> results with chain-of-custody documentation; <br /> • Description and documentation of QA/QC procedures employed for field and <br /> laboratory work; <br /> • An assessment of the results with conclusions and recommendations for well <br /> operating rate and use; <br /> • Submission of DWR well drillers report. <br /> Upon completion of the Water Conservation Plan, the team (Kleinfelder, Randall, Pace, <br /> Stantec, etc.) will submit a report to PCCPML and the entire team for review. We will <br /> finalize the report as a stand-alone document, and make the report available for the <br /> IWMP and possibly the EIR. <br /> Upon completion of the IWMP, the team (Kleinfelder, Randall, Pace, Stantec, etc.) will <br /> submit a report to PCCPML and the entire team for review. We will finalize the report <br /> as a stand-alone document, and make the report available for the EIR <br /> TASK 7 — MEETINGS AND PROJECT LIAISON <br /> We will attend meetings with the City of Stockton, CalWater, PCCPML and the various <br /> team members working on the project. The meetings we anticipate are as follows: <br /> • Regular PCCPML team meetings (bi-monthly). <br /> • Special PCCPML meetings related to the IWMP. <br /> • Meeting with the City of Stockton and/or CalWater to discuss the SB610 reports <br /> in progress for the development site. <br /> • Meetings with water purveyors, irrigation districts, etc. to discuss water sources <br /> available to the project. <br /> We are estimating 75 hours of meetings. This is subject to change based on <br /> requirement of PCCPML. <br /> 02001 PROP.ENV/ST05P346R/JDZJv Page 9 of 12 <br /> ©2005 Kleinfelder, Inc. December 2, 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.